European funded projects

I. EU - FUNDED PROJECTS- SUBMITTED TO  EVALUATION
1. STRENGHTENING THE CAPACITY OF PUBLIC NON-UNIVERSITY SCHOOLS IN THE MUNICIPALITY OF CONSTANȚA IN THE CONTEXT OF COVID-19
Financing source Large Infrastructure Operational Programme 2014-2020, Axis 9, Specific objective 9.1 Increase the capacity to manage the COVID-19 health crisis
   
Beneficiary

Administrative Territorial Unit Constanța Municipality 


   
General objective

The general objective of the project aims to ensure an adequate capacity to manage the health crisis at the level of 92 non-university schools in Constanța, by equipping them with medical protection equipment and medical devices necessary to reduce the risk of spreading SARS-CoV-2 infection. 

Date for submitting the financing application

16.12.2020
Suggested implementation period 7 months

II. EU - FUNDED PROJECTS - STAGE PRECONTRACTING/CONTRACT
III EU-FUNDED PROJECTS - IN IMPLEMENTATION
1. ENDOWMENT OF SCHOOLS IN THE MUNICIPALITY OF CONSTANTA WITH IT EQUIPMENTS, IN THE CONTEXT OF COVID-19 
Financing source

Competitiveness Operational Programme 2014-2020, Axis 2: Information and Communication Technology (ICT) for a competitive digital economy, Specific objective 2.4 Increase the use of Internet

   
Beneficiary

Administrative Territorial Unit Constanţa Municipality


   
General objective

The general objective of the project is to facilitate access to on-line education in the context of the SARS-CoV-2 pandemic, by endowment of secondary schools in Constanța with IT mobile equipment such as school tablets, as well as other equipment / electronic devices necessary for on-line teaching activity in right conditions, in the school year 2020/2021.

Date for submitting the financing application



16.11.2020
Suggested implementation period
12 months

2. REHABILITATION OF PRIMARY THERMAL NETWORKS / THERMAL ENERGY TRANSPORT IN THE MUNICIPALITY OF CONSTANȚA - STAGE 2
Financing source

Large Infrastructure Operational Programme 2014-2020, Axis 7, Specific objective 7.1 Increase of the energy efficiency  in centralized heat transmission and distribution systems in selected cities

Beneficiary

Administrative Territorial Unit Constanţa Municipality 

Financing contract  889 / 31.01.2022
Total value of the project 116.136.102,77 lei, out of which eligible value 97.804.515,67 lei
General objective 

The general objective of this project is to increase the energy efficiency of the heating system in the Municipality of Constanța, by reducing thermal energy losses in the primary heating networks. 

Suggested implementation period 31.01.2022 – 31.12.2023

3. REHABILITATION OF PRIMARY THERMAL NETWORKS / THERMAL ENERGY TRANSPORT IN THE MUNICIPALITY OF CONSTANȚA - STAGE 1
Financing source

Large Infrastructure Operational Programme 2014-2020, Axis 7, Specific objective 7.1 Increase of the energy efficiency  in centralized heat transmission and distribution systems in selected cities

   
Beneficiary

Administrative Territorial Unit Constanţa Municipality

Financing contract 822 / 13.01.2022
Total value of the project 115.405.074,99 lei, out of which eligible value 97.189.192,26 lei
General objective 

The general objective of this project is to increase the energy efficiency of the heating system in the Municipality of Constanța, by reducing thermal energy losses in the primary heating networks 

Suggested implementation period
13.01.2022 - 31.12.2023

4. BUILDING OF A MODULAR HOSPITAL, FOR STRENGTHENING MEDICAL CAPACITY OF THE CLINICAL HOSPITAL FOR INFECTIOUS DISEASES CONSTANȚA, IN THE CONTEXT OF COVID-19
Financing source

Large Infrastructure Operational Programme 2014-2020, Axis 9, Specific objective 9.1 Increase the capacity to manage the COVID-19 health crisis

Beneficiary 

Administrative Territorial Unit Constanţa Municipality 

Financing contract

706/16.11.2021

Total value of the project


14.578.935,74 lei, out of which eligible value 14.570.576,74 lei


General objective
The general objective of this project is to strengthen and increase the capacity to manage the emergency situation caused by the COVID-19 health crisis at the Clinical Hospital of Infectious Diseases Constanța, by creating a modular hospital to supplement the capacity for day hospitalization (emergency reception space ans isolation of patients suspected / confirmed with virus).
 

Suggested implementation period

 

23.02.2021 – 30.06.2023

5. INCREASE OF THE ENERGY EFFICIENCY OF MIRCEA CEL BĂTRÂN NATIONAL COLLEGE BUILDING, CONSTANȚA
Financing source

Regional Operational Programme 2014-2020, Axis 3, Investments priority 3.1.B-Public buildings/Call 2/NE, SE, SM

Beneficiary

Administrative Territorial Unit Constanta Municipality

Financing contract  7290/25.11.2021 
   
General objective The general objective of this project is the increase of the energy efficiency of Mircea cel Bătrân National College building, by implementation of a set of measures to optimize the energy consumption of the building and to align to the European performance standards and requirements.
   
Total value of the project   19.398.470,14 lei, out of which eligible value 13.880.117,17 lei 

Value of eligible co-financing (2%)

277.602,35 lei

Suggested implementation period

25.11.2021 – 31.12.2023


6. RECHARGING STATIONS FOR ELECTRIC VEHICLES IN CONSTANTA MUNICIPALITY
Financing source Environmental fund administration – „The programme regarding reducing green house gas emision in transports through promoting the infrastructure for non poluting vehicles in terms of energy: electric vehicle charging in all county capital "
   
Beneficiary

Administrative Territorial Unit Constanţa Municipality


Financing contract  2/GES/02.11.2021
Total value of the project   4.414.727,55 lei, out of which eligible value 3.839.573,41 lei
General objective

To reduce the green house gas emision generated by vehicle traffic by developing the infrastructure for electric charging by mouting 18 vehicle electric charging stations.

Suggested implementation period 02.11.2021 - 01.11.2022

7. INCREASE OF THE ENERGY EFFICIENCY OF DECEBAL THEORETICAL HIGH SCHOOL BUILDING, CONSTANȚA
Financing source

Regional Operational Programme 2014-2020, Axis 3, Investments priority 3.1.B-Public buildings/Call 2/NE, SE, SM

Beneficiary

Administrative Territorial Unit Constanta Municipality

Financing contract  6816/02.04.2021 
General objective The general objective of this project is the increase of the energy efficiency of Decebal Theoretical High School building, by implementation of a set of measures to optimize the energy consumption of the building and to align to the European performance standards and requirements
Total value of the project  13.644.198,43 lei, out of which eligible value 11.100.255,91 lei 

Value of eligible co-financing ( 2% )

222.005,12 lei

Suggested implementation period 02.04.2021 - 30.09.2023

8. REHABILITATION, MODERNISATION AND ENDOWMENT OF “MUGUREL” FULL-DAY KINDERGARTEN, CONSTANȚA
Financing source

Regional Operational Programme 2014-2020 - Axis 4/ Investment priority 4.4

Beneficiary

Administrative Territorial Unit Constanta Municipality

Financing contract  6737/05.03.2021 
General objective

By rehabilitating, modernising and equipping “MUGUREL” full-day kindergarten of Constanța Municipality, the aim is to ensure that the educational activities intended for pre-school education are carried out in optimum conditions, at standards comparable with those of the European Union.

Total value of the project   3.987.982,84 lei out which eligible value 3.913.739,39 lei 
Value of eligible co-financing (2%)
78.274,79 lei 
Suggested implementation period  

05.03.2021 – 31.07.2023


9. INCREASE OF THE ENERGY EFFICIENCY OF TRAIAN THEORETICAL HIGH SCHOOL BUILDING, CONSTANȚA
Financing source

Regional Operational Programme 2014-2020, Axis 3, Investments priority 3.1.B-Public buildings/Call 2/NE, SE, SM

Beneficiary

Administrative Territorial Unit Constanta Municipality

Financing contract  6701/26.02.2021
General objective The general objective of this project is the increase of the energy efficiency of Traian Theoretical High School building, by implementation of a set of measures to optimize the energy consumption of the building and to align to the European performance standards and requirements.
Total value of the project  13.378.737,47 lei out of which eligible value 10.811.964,95 lei
 Value of eligible co-financing (2%)  
216.239,30 lei
Suggested implementation period
26.02.2021-30.06.2023

10. INTEGRATED RECONDITIONING OF THE PEDESTRIAN AREA IN THE HISTORIC CENTRE OF CONSTANȚA MUNICIPALITY - STAGE II
Financing source

Regional Operational Programme 2014-2020 Priority axis 4, Investment priority 4e

Beneficiary

Administrative Territorial Unit Constanţa Municipality

Financing contract 6690/22.02.2021
General objective

The general objective of the project is the promotion of sustainable urbane mobility by the urban regeneration of the historic area of Constanța Municipality through a series of measures which lead to the increase of pedestrian mobility. Moreover, the intention is to make the use of motor vehicles in the historic centre of the municipality less attractive. Therefore, by rehabilitating some streets and by restricting the access for personal motor vehicles in this area of Constanța Municipality, the aim is to improve the sustainable urbane mobility, as well as to reduce the CO2 equivalent emissions.

Total value of the project  26.443.554,43 lei out of which eligible value 25.317.651,31 lei

Value of eligible co-financing (2%)

 506.353,03 lei
   
Suggested implementation period   22.02.2021 - 30.11.2023
   

11. DEVELOPING CULTURAL AND CREATIVE INDUSTRIES IN THE BLACK SEA BASIN (ACRONYM CREA – CENTERS )
Financing source Joint Operational Programme "Black Sea Basin" 2014-2020
Leader  Cekmekoy Municipality – Turkey ;
   
Partners

Administrative Territorial Unit Constanța Municipality, together with entities from Greece, Bulgaria and Ukraine;

Total value of the project

1.448.754,24 euro


Value of partner 
Administrative Territorial Unit Constanța Municipality

- total eligible value:  213.750 euro;
- non-refundable eligible amount from ENI: 196.650 euro (92%);
- eligible co-financing: 17.100 euro (8%).


Implementation period
 

25.12.2020 – 24.12.2022


General objective

Setting up and developing structures and networks for designers, entrepreneurs, academicians and artists operating in the field of cultural and creative industries (CCIs) in the Black Sea Basin.

 

Results

5 co-working spaces established and endowed in partner locations (1 space/partner), 86 mass-events organized for collaboration of people from CCIs. 

12. STRENGHTENING MEDICAL CAPACITY OF THE CLINICAL HOSPITAL FOR INFECTIOUS DISEASES CONSTANȚA, IN THE CONTEXT OF COVID-19
Financing source

Large Infrastructure Operational Programme 2014-2020, Axis 9, Specific objective 9.1 Increase the capacity to manage the COVID-19 health crisis

Leader

Administrative Territorial Unit Constanța Municipality

Partner  Clinical Hospital for Infectious Diseases Constanța 
Financing contract 

380 / 02.10.2020 

General objective The general objective of this project is to strengthen and increase the capacity to manage the emergency situation caused by the COVID-19 health crisis at the Clinical Hospital of Infectious Diseases Constanța, by providing medical and personal protection equipment necessary to ensure appropriate treatment for all patients infected with SARS-CoV-2 and to reduce the risk of contamination of hospital staff and patients.

Total value of the project 

22.681.089,84 lei, from which eligible value 22.672.404,84 lei (100% FEDR financing) 
Suggested implementation period 02.10.2020 – 30.06.2022

13. REHABILITATION, MODERNISATION AND ENDOWMENT OF TECHNOLOGICAL HIGH SCHOOL FOR ELECTRICAL ENGINEERING AND TELECOMMUNICATION, CONSTANȚA
Financing source

Regional Operational Programme 2014-2020 - Axis 4/ Investment priority 4.4, specific objective 4.5

Financing contract  5797/28.07.2020 
Beneficiary

Administrative Territorial Unit Constanta Municipality

General objective Increase of the educational infrastructure relevant for the labour market in Constanța Municipality, as determining factor for the increase of the educational process quality, early development of children, for building social skills and the social integration capacity. 
   
Total value of the project  10.247.493,19  lei, out of which eligible value 10.236.783,19 lei 
 

Value of eligible co-financing (2%)



204.880,87 lei
Suggested implementation period  

28.07.2020 -  28.02.2023


14. INTEGRATED STRATEGIC PLANNING AND EFFICIENT PUBLIC ADMINISTRATION AT THE LEVEL OF GROWTH POLE “INTERCOMMUNITY DEVELOPMENT ASSOCIATION CONSTANȚA METROPOLITAN AREA”
Financing source

Project co-financed by the European Social Fund, through the Operational Programme Administrative Capacity 2014-2020

MySMIS code/ project code  MySMIS 2014: 135502/ SIPOCA 849 
Beneficiary

Administrative Territorial Unit Constanta Municipality

Partner

Intercommunity Development Association "Constanța Metropolitan Area" 
Total value of the project  

Total eligible value of the project - 3.699.711,30 lei;
Beneficiary’s eligible co-financing - 53.674,95 lei (2%);
Partner’s eligible co-financing - 20.319,28 lei (2%);
Valoare eligibilă nerambursabilă din FSE - 3.127.483,22 lei;
Valoare eligibilă nerambursabilă din bugetul național - 498.233,85 lei. 

Implementation period 

20.07.2020 - 19.01.2023 

Objectives

The general objective of the project is to improve the administrative capacity at the level of Administrative Territorial Unit Constanţa Municipality and its entire Functional Urban Area, by developing the capacity of integrated strategic planning, streamlining the management processes and simplifying administrative procedures, in order to respond, in a fundamental and coherent way, to local communities needs.
Specific objectives
Specific objective 1 -  Development of strategic planning capacity at the level of Administrative Territorial Unit Constanţa Municipality and Constanţa Metropolitan Area, by updating the Integrated Urban Development Strategy and the portfolio of priority projects of Constanța Metropolitan Area;
Specific objective 2 – Streamlining and simplifying of services provided to citizens by Administrative Territorial Unit Constanţa Municipality through a ”shared skills” computer system and further retro-digitization archive;
Specific objective 3 -  Strengthening the institutional capacity of Administrative Territorial Unit Constanţa Municipality and other local public authorities in the Constanţa Metropolitan Area, by adequately training staff in the field of strategic planning and efficient public management.            

Results 

- Updated Integrated Urban Development Strategy and portfolio of priority projects of the Constanța Metropolitan Area;
- Achieved ”shared skills” computer system;
- Electronic archive made for at least 900 linear meters physical archive;
- 44 trained persons at Constanța Metropolitan Area level. 


15.  IMPROVEMENT OF MOBILITY IN CONSTANŢA MUNICIPALITY, 1 MAI BLVD. –  ȘOSEAUA MANGALIEI ROAD AREA
Financing source

Regional Operational Programme 2014-2020 Priority axis 4, Investment priority 4e

Beneficiary

Administrative Territorial Unit Constanţa Municipality

Grant contract

5568/11.06.2020

   

General objective

The general objective of the project is to improve the urban mobility in Constanța Municipality, by a re-systematization of the transport infrastructure on 1 Mai Blvd. and Șoseaua Mangaliei Road. In order to encourage the use of more environment-friendly transport means, some lanes dedicated to public transport and to bicycles will be introduced and the roadway and sidewalks will be rehabilitated. The purpose of these interventions is mainly to reduce the GHG emissions and to promote sustainable urban mobility by making investments in the urban public transport infrastructure and in the infrastructure specific for travelling by foot and by bicycle, in order to ensure a free and safe movement of people. All these shall lead to the improvement of the environmental conditions and life quality for the citizens and visitors of Constanța Municipality.

Total value of the project 

 
69.800.962,02 lei

 

Value of eligible co-financing (2%)

1.396.019,24  lei

Proposed implementation period

11.06.2020 - 31.07.2023


16. REHABILITATION, MODERNIZATION AND EQUIPMENT OF TECHNOLOGICAL HIGH SCHOOL DIMITRIE LEONIDA BUILDING, CONSTANȚA
Financing source

Regional Operational Programme 2014-2020 - Axis 4/ Investment priority 4.5

Beneficiary

Administrative Territorial Unit Constanta Municipality

Financing contract 

5352/30.04.2020 

General objective

Rehabilitation, modernization and equipment of C3 Corps of Technological High School Dimitrie Leonida (the canteen restord in workshops), in order to ensure the operation of secondary technological education activities in optimal conditions, at standards comparable to those in the European..

Total value of the project  7.777.842,86 lei  
 

Value of the eligibile cofinancing (2%)


153.103,27 lei 
Suggested implementation period  01.05.2020 - 31.12.2022

17. INCREASE OF ENERGY EFFICIENCY OF THE CONSTANȚA STATE THEATRE BUILDING
Financing source

Regional Operational Programme 2014-2020 - Axis 3/ Investment priority 3.1.B -SUERD/1

Beneficiary

Administrative Territorial Unit Constanţa Municipality

Financing contract 

5336/30.04.2020 

General objective

The general objective of this project is the increase of the energy efficiency of the building where the State Theater operates, by implementation of a set of measures to optimize the energy consumption of the building and to align to the European performance standards and requirements.

Total value of the project   4.863.953,22 lei  
Value of the eligibile cofinancing (2%)
63.089,04 lei
Suggested implementation period  01.05.2020 - 30.11.2023

18. PEDESTRIAN ACCESS AND MOBILITY IN THE CENTRAL AREA OF CONSTANŢA MUNICIPALITY
Financing source

Regional Operational Programme 2014-2020 Priority axis 4, Investment priority 4e

Beneficiary

Administrative Territorial Unit Constanţa Municipality

Financing contract   5224/06.04.2020 
General objective

The general objective of the project is the promotion of sustainable urbane mobility by the urban regeneration of the central area by a series of measures which lead to the increase of pedestrian accessibility and mobility in this area of the municipality. The aim of this project is to increase the modal share of moving by food and by bicycle, by transforming the segment of Ștefan cel Mare street in a modern pedestrian esplanade (sidewalks and shared-space areas), by rehabilitating the adjacent streets and by creating lanes dedicated to public transport and bicycle paths on Ferdinand Blvd. and Mircea cel Bătrân street. Moreover, the intention is to make the use of motor vehicles in the central area of the municipality less attractive. For this purpose, the access of personal/private motor vehicles in this area will be limited, which shall lead to the reduction of CO2 equivalent emissions.

Total value of the project

89.854.757,70 lei from which eligible value 89.854.757,70 lei  
Value of the eligibile cofinancing (2%)  1.797.095,20 lei  
Suggested implementation period   06.04.2020 - 30.06.2023

19. INCREASE OF ENERGY EFFICIENCY OF THE 8 SECONDARY SCHOOL BUILDING, CONSTANȚA
Financing source

Regional Operational Programme 2014-2020 - Axis 3/ Investment priority 3.1.B -SUERD/1

Beneficiary

Administrative Territorial Unit Constanta Municipality

Financing contract 

5172/24.03.2020 

General objective

Increase of the energy efficiency for the building where the 8 Secondary School of Constanța operates, by implementing a set of measures designed to optimize the energy consumption of the building and alignment to the European performance standards and requirements.

Total value of the project  4.878.047,09 lei, from which eligible value 4.537.724,78 lei
Value of the eligibile cofinancing (2%) 90.754,52 lei 
Suggested implementation period  24.03.2020 - 30.09.2023

20. INCREASE OF ENERGY EFFICIENCY OF THE 38 SECONDARY SCHOOL BUILDING, DIMITRIE CANTEMIR, CONSTANȚA
Financing source

Regional Operational Programme 2014-2020 - Axis 3/ Investment priority 3.1.B -SUERD/1

Beneficiary

Administrative Territorial Unit Constanţa Municipality 

Financing contract 

5095/25.02.2020 

General objective

Increase of the energy efficiency for the building where the 38 Secondary School, Dimitrie Cantemir of Constanța Municipality operates, by implementation of a set of measures to optimize the energy consumption of the building and to align to the European performance standards and requirements. 
Total value of the project  5.406.111,64 lei, from which eligible value 4.735.030,83 lei
Value of the eligibile cofinancing (2%)  94.700,62 lei 
Suggested implementation period 25.02.2020 - 30.09.2022

21.  MOBILITY IMPROVEMENT IN CONSTANŢA MUNICIPALITY, BETWEEN TRAIN STATION AND MAMAIA RESORT
Financing source

Regional Operational Programme 2014-2020, Priority axis 4, Investments priority 4e

Beneficiary

Administrative Territorial Unit Constanţa Municipality

Grant contract

5091/17.02.2020

   

General objective

The general objective of the project is to improve the urban mobility in Constanța Municipality, by a re-systematization of the transport infrastructure on 1 decembrie 1918 Blvd. and Alexandru Lăpușneanu Blvd.  In order to encourage the use of more environment-friendly means of transport, lanes dedicated to public transport and to bicycles will be introduced and the roadway and sidewalks will be rehabilitated. The purpose of these interventions is mainly to reduce the GHG emissions and to promote sustainable urban mobility through investments in the urban public transport infrastructure and in the specific infrastructure for travelling by foot and by bicycle, in order to ensure a free and safe movement of people. All of these will lead to the improvement of environmental conditions and life quality for the citizens and visitors of Constanța Municipality.

Total value of the project 

 
91.361.641,40 lei

 

Value of eligible co-financing (2%)

1.827.232,84  lei

Proposed implementation period

17.02.2020 - 30.04.2023


22. REHABILITATION, MODERNISATION AND ENDOWMENT OF “AMICII” FULL-DAY KINDERGARTEN, CONSTANȚA
Financing source

Regional Operational Programme 2014-2020 in partnership, Priority axis 4, Investment priority 4.4 Investments in education, in training, including professional training for the aquirement of skills and learning during lifetime, through the development of education and training infrastructures

Beneficiary

Administrative Territorial Unit Constanţa Municipality

Financing order 

5029/20.12.2019 

General objective 

By rehabilitating, modernising and equipping “AMICII” full-day kindergarten of Constanța Municipality, the aim is to ensure that the educational activities intended for pre-school education are carried out in optimum conditions, at standards comparable with those of the European Union

Total value of the project  

6.057.289,73 lei

   

Value of eligible co-financing (2%)


120.931,60 lei
Suggested implementation period  30.08.2018 - 30.06.2022

23. ACQUISITION OF PUBLIC TRANSPORTATION BUSES - ELECTRICAL BUSES 10 METERS LENGTH, ALEXANDRIA, BRĂILA, CONSTANȚA, DROBETA TURNU SEVERIN, FOCȘANI, SLOBOZIA
Financing source

Regional Operational Programme 2014-2020 in partnership, Priority axis 4, Investment priority 4e

Leader

Ministry of Public Works, Development and Administration

Partners

Admnistrative Territorial Unit Alexandria Municipality,  Admnistrative Territorial Unit Brăila Municipality, Admnistrative Territorial Unit ConstanȚa Municipality, Admnistrative Territorial Unit Drobeta Turnu Severin Municipality, Admnistrative Territorial Unit FocȘani Municipality, U.A.T. Admnistrative Territorial Unit Slobozia Municipality

 Financing order  4817/04.11.2019

General objective

Acquisition of 21 electric buses of 10 meters length, 21 slow loading stations and 5 fast loading stations 

Total value of the project for the Admnistrative Territorial Unit Constanta Municipality partner

56.388.223,95 lei

 

Value of eligible co-financing (2%)

968.164,48 lei

Proposed implementation period

04.11.2019 -31.12.2022


24. ACQUISITION OF PUBLIC TRANSPORTATION BUSES - ELECTRICAL BUSES 12 METERS LENGTH, ALBA IULIA, BUZĂU, CONSTANTA, PLOIESTI
Financing source Regional Operational Programme 2014-2020 in partnership, Priority axis 4, Investment priority 4e
   
Leader

Ministry of Regional Development and Public Administration

Partners

Admnistrative Territorial Unit Constanta Municipality, Admnistrative Territorial Unit  Alba Iulia Municipality, Admnistrative Territorial Unit Buzău Municipality, Admnistrative Territorial Unit Ploiești Municipality

General objective 

Acquisition of 20 electric buses with 12 meters length, 20 slow loading stations and 5 fast loading stations

The total value of the project for the partner U.A.T. Constanța 65.733.918,25  lei
   
Eligible co-financing amount (2%)  1.124.678,37  lei 
   
Suggested implementation period 01.10.2019 - 28.02.2023

25. BUSINESS INCUBATOR CONSTANȚA
Financing source

Regional Operational Programme 2014-2020 - Axis 2.1B

Beneficiary Administrative Territorial Unit Constanța Municipality 

Financing contract
 

4485/01.07.2019

General objective

Consists in creating a sectoral business incubator, intended for the sector of creative industries, in a building having the height capacity S+P+4E+M [*basement + ground floor + 4 floors + attic], located in Constanța Municipality, aiming to become the first regional hub for the entrepreneurial community involved in the sector of creative industries in the South – East region and to contribute to the growth of the regional competitiveness, to the generation of innovation and new skilled employment with competitive pay. The incubator shall provide high quality support services for the incubated companies and shall create mechanisms facilitating the transfer of experience, know-how and knowledge specific to successful business development, both by the new entrepreneurs of the creative industries, as well as by the entire entrepreneurial community in the South – East region.
 
Total value of the project

14.028.656,56 lei, non-refundable amount 7.048.091,68 lei

 
 

Value of eligible co-financing 46,89%



6.222.491,68 lei

 
Suggested implementation period 01.07.2019 - 31.03.2023
   

26. REHABILITATION OF 16 SECONDARY SCHOOL "MARIN IONESCU DOBROGIANU"
Financing source

Regional Operational Programme 2014-2020 - Axis 10

Beneficiary Administrative Territorial Unit Constanța Municipality 
Financing contract  4333/23.05.2019 

General objective

The general objective of the project is to improve the quality of the educational infrastructure, namely the rehabilitation, modernisation, extension and endowment of 16 Secondary School “Marin Ionescu Dobrogianu” of Constanța in order to ensure an educational process at European standards, an increase of the participation of school population and adults to the educational process.
Total value pf the project 

6.342.072,04 lei,  non-refundable amount 6.327.181,12 lei 

   

Value of eligible co-financing (2%)

126.543,67 lei 
Suggested implementation period 23.05.2019 - 31.08.2022

27. SMART CT
Financing Source

Project co-financed by the din European Social Fund, through the Operational Programme Administrative Capacity 2014-2020

MYSMIS code/ project code MySMIS 2014: 126409/ SIPOCA 551 
   
Beneficiary
Administrative Territorial Unit Constanța Municipality
   
Total value of the project Total eligible value of the project – 3,618,486.48 lei;
Eligible co-financing of the beneficiary – 72,369.73 lei (2%);
Non-refundable eligible amount from ESF – 3,075,713.52 lei;
Non-refundable eligible amount from national budget- 470,403.23 lei;
   
Implementation period

05.12.2018 - 04.01.2023

   

Objectives

The general objective consists in strengthening the administrative capacity of the Administrative Territorial Unit Constanța Municipality by developing the strategic planning capacity and by simplifying the administrative procedures, in correlation with the introduction of electronic methods for the management of administrative documents.                         

Specific objectives
Specific objective 1 -  Development of the strategic planning capacity at the level of the local public administration of Constanţa Municipality by crating the Smart City Strategy for the municipality;
Specific objective 2 – Increasing the efficiency and simplifying the services provided for citizens by implementing a portal of digital services for citizens, documents management, ERP and partial digitalization of the archive;
Specific objective 3 -  Promoting modernisation I nteh local public administration of Constanţa Municipality by specialising the city hall employees on topics specific to the project (strategic planning), which shall motivate and drive them towards innovation and providing quality public services for citizens. 

Results 

– the Smart City Strategy of the a municipality is elaborated
– the analysis – diagnostic of the computer and document management system;
– developed and implemented integrated computer system;
– electronic archive for at least 1600 linear meters of physical archive;
– 10 persons trained in the field of strategic planning.


IV. FINISHED PROJECTS

1. INCREASE OF ENERGY EFFICIENCY OF THE 17 SECONDARY SCHOOL BUILDING, ION MINULESCU, CONSTANȚA
Financing source

Regional Operational Programme 2014-2020 - Axis 3/ Investment priority 3.1.B -SUERD/1

Beneficiary

Administrative Territorial Unit Constanta Municipality

Financin contract 

5141/12.03.2020 

General objective

Implementing a set of measures designed to optimize the energy consumption of the building and alignment to the European performance standards and requirements.

Total value of the project 4.208.917,27 lei, from which eligible value 3.838.412,59 lei 
Completion date 30.09.2020 

2. Communication of Local AuthoRities for INtegration in European Towns (ACRONYM CLARINET)
Financing source EUROPEAN COMMISSION-AMIF-2017-AG-INTE
   
Leader

Comuni Di Lampedusa E Linosa, Italy

Partners

Administrative Territorial Unit Constanța Municipality, together with entities from Romania, Italy, Austria, Hungary, Greece, Germany, Slovenia,  Cyprus, Bulgaria, Belgium.

Total value of the project

786.869,22 euro 
General objective 

Increase the awareness of EU citizens about the positive contribution that migrants bring to EU host societies.

Completion date

30.06.2022


1. MULTI-MODAL OPTIMISATION FOR ROAD-SPACE IN EUROPE (ACRONYM MORE)
Financing Source

HORIZON 2020 - MG-7-2-2017 ;

Leader

UNIVERSITY COLLEGE OF LONDON , United kingdom;

Partners
Administrative Territorial Unit Constanța Municipality  together with entities from Germany, France, Holland, United kingdom, Belgium, Czech Republic, Hungary, Romania, Portugal, Sweden;

Total value of the project

5.537.113.75 euro

Partner value
Administrative Territorial Unit Constanța Municipality

- Total eligible value:  194,375 euro;
- Integral financing from the European Commission;

Implementation period

01.09.2018 - 28.02.2022

Objectives

Ensuring a comprehensive and objective approach for planning, designing and operating the road territory on the corridors of the international roads network TEN-T; 

Results 

5 Strategies for a better allocation of the road territory for the roads making the connection with the TEN-T European network.


2. INCREASE OF ENERGY EFFICIENCY OF THE OVIDIUS THEORETICAL HIGH SCHOOL BUILDING, CONSTANTA
Financing Source

Regional Operational Programme 2014-2020 - Axis 3/ Investment priority 3.1.B

Beneficiary
Administrative Territorial Unit Constanţa Municipality
   

Financing contract

2897/16.08.2018

General objective Increase of the energy efficiency for the building where the Ovidius Theoretical High School of Constanța operates, by implementing a set of measures designed to optimize the energy consumption of the building and alignment to the European performance standards and requirements.
   
Total value of the project

10,350,870.72 lei

Value of eligible co-financing (2%)

205,650.53 lei

   
Suggested implementation period  16.08.2018-20.01.2022
   

3. SNAPSHOTS FROM THE BORDERS – SMALL TOWNS FACING THE GLOBAL CHALLENGES OF AGENDA 2030
Financing Source

DEAR (Development Education and Awareness Raising)

Leader

Comuni Di Lampedusa E Linosa, Italy

   
Partener

Administrative Territorial Unit Constanța Municipality, together with entities from Romania, Italy, Austria, Hungary, Greece, Germany, Slovenia, Bosnia - Herzegovina, Cyprus, Bulgaria, France, Sweden, Spain, Malta

   

Total value of the project

5.352.358,28 euro

Value of the partener Administrative Territorial Unit Constanța Municipality 

46.123,01 euro, out of which:
- non-refundable eligible value: 41.335,44 euro;
- eligible co-financing: 4.787,57 euro (10,38%).

General objective

Improvement of critical understanding of the European, national and local decision-makers, as well as of the public opinion regarding the migration determined by the European border flows.

Results 

- Increased number of European citizens informed on global migration and on key factors which determine migration and a high understanding from the local decision-makers regarding the key factors determining the migration flows;
- The "Border cities network" shall be built as an innovative tool in order to develop itself horizontally.

Completion date  20.10.2021 
   

4. ALTERNATIVE BUILDING ACTIVATION UNITS (ACRONYM ALT/BAU)
Financing Source

URBACT III Program - Transfer Networks Phase II

Leader
City of Chemnitz, Germany
   

Partners

Administrative Territorial Unit Constanța Municipality, together with entities from Poland, Latvia, Belgium, Spain, Italy;

Total value of the project 595.000 euro /network (stage I + stage II)
 
Value of the partner Administrative Territorial Unit Constanța Municipality

44.715 euro, out of which 
- ERDF contribution 38.007,75 euro (85%);
- local co-funding 894,30 euro (2%);

General objective

Revitalisation of vacant and degraded historical buildings, by a proactive approach of connection to the public administrations, owners, investors and users.
   
Results  Experience and good practices exchange at transnational level. 
   
Completition date  30.09.2021 
   

5. DEVELOPMENT OF SUSTAINABLE CULTURAL TOURISM IN THE BLACK SEA BASIN (ACRONYM CULTOUR-BSB)
Financing Source

Joint Operational Programme "Black Sea Basin" 2014-2020

Leader Sozopol Municipality, Bulgaria
   
Partners
Administrative Territorial Unit Constanța Municipality  together with entities from Georgia, Ukraine, Turkey
   

Total value of the project

957,792.24 euro 

Partner value
Administrative Territorial Unit Constanța Municipality

- Total eligible value:  118,169 euro;
- Non-refundable eligible amount from ENI: 108,715.48 euro (92 %);
- Eligible co-financing: 9,453.52 euro (8%);

General objective

Joint development and promotion of cross-border business opportunities in the tourism sector within the Black Sea Basin, with an emphasis on the cultural segment. 

Results 

A joint strategy for the promotion of cross-border tourism.

Completion date  10.09.2021 

6. CERTOUR II: FOR A BETTER SME MANAGEMENT (ACRONYM CERTOUR II)
Financing Source

Joint Operational Programme "Black Sea Basin" 2014-2020

Leader Technical Chamber of Greece - Eastern Macedonia Branch; 
   
Partners
Administrative Territorial Unit Constanța Municipality  together with entities from Ukraine, Turkey, Armenia, Greece;
   

Total value of the project

827,860 euro; 

Partner value
Administrative Territorial Unit Constanța Municipality

- Total eligible value: 156,562 euro;
- Non-refundable eligible amount from ENI: 144,037.04 euro (92%);
- Eligible co-financing: 12,524.96 euro (8%);

Completion date 

10.07.2021

Objectives

Improvement of the management and persons working in the SMEs in the field of tourism; 

Results 

Building an integrated platform for the management of SMEs with the support of mentors register, management tools and e-training platform.


7.  INTEGRATED MEASURES FOR A BETTER LIFE
Financing Source POCU 2014-2020 (Operational Programme Human Capital) - Operation 4.1 
Leader Administrative Territorial Unit Constanța Municipality
   
Partener "Decebal” Theoretical High School 
   

Total value of the project

10,854,192.75 lei out of which refundable amount 10,788,092.75 lei

General objective

Reducing the number of persons at risk of poverty or social exclusion from the studies marginalised community where there is Rroma population, by supporting the social and economic integration of 600 persons from the marginalised community residing in the intervention area which includes the "Henri Coandă" social campus as well.

Results 

-  Integrated social services, medical and medico-social services
-  Supporting access and participation to education;
-  Support or access and/or maintaining on the labour market;
-  Supporting entrepreneurship and employment on one’s own;
-  Improvement of living conditions.

Completion date   15.08.2021 

8. PORT - CITIES: INNOVATION FOR SUSTAINABILITY (ACRONYM PORTIS)
Financing Source

Horizon 2020 -  MG.5.5 – 2015;

Beneficiary 

City of Anvers, Belgium;

   
Partener

Administrative Territorial Unit Constanța Municipality, together with 33 entities from 33 the Consortium: Belgium, Scotland, Italy, Lithuania, China;

   

Total value of the project

17,678,400.00 euro

Partner value
Administrative Territorial Unit Constanța Municipality 

476,078 euro
- Non-refundable eligible value: 476,078 euro;

completion date

30.11.2020 

General objective

Innovative solutions on the manner in which the mobility and accessibility measures are used to increase the functional and social cohesion between the city and the port.  

Results 

Improvement of the governance for an increased cooperation between cities and ports, creating a more sustainable and healthier city-port environment, creating an integrated transport infrastructure and mobility system, increasing the efficiency of the urban passenger and freight transport.


completion date
completion date
completion da
9. "WIFI4 EU PROMOTION OF INTERNET CONNECTIVITY IN LOCAL COMMUNITIES" OF CONSTANȚA MUNICIPALITY
Financing Source

Free Wi-Fi for Europeans Programme

Financing contract   INEACEF/WiFi4EU/1/2018/010009-013149
Leader
Administrative Territorial Unit Constanța Municipality
   
Total value of the project 13.336 euro (voucher)
   
completion date

18.06.2020

   

General objective

The initiative WiFi4EU promotes free access to Wi-Fi in public areas such as parks, squares and public buildings, libraries, health care centres and museums, in the entire EU.
   
Results  Installation of new Wi-Fi networks in order to provide free access to Wi-Fi in10 locations on seafront of Constanța Casino.

10. INCREASING THE ADMINISTRATIVE CAPACITY OF CONSTANȚA MUNICIPALITY BY IMPLEMENTING MEASURES IN THE FIELD OF ANTICORRUPTION 
Financing Source

“Project co-financed by the European Social Fund, through the Operational Programme Administrative Capacity 2014-2020”

MySMIS code/ project code 

MySMIS 116521/ SIPOCA 405 


Beneficiary 

Administrative Territorial Unit Constanța Municipality; 
   

Total value of the project

Total eligible value of the project – 237.579,83 lei;
Eligible co-financing of the beneficiary – 4.751,60 lei;
Non-refundable eligible amount from ESF – 201.942,85 lei;
Non-refundable eligible amount from national budget – 30.885,38 lei.

completion date

23.11.2019




Objectives

General objective
Elaborating an anticorruption operational procedure, of a guide/manual of good practices of ethics and integrity and training the staff of the Constanţa City Hall in order to enforce the corruption prevention measures. 

Specific objectives
Specific objective 1 -  Elaborating a guide/ operational procedure on corruption and the necessary measures to prevent it;
Specific objective 2 - Elaborating a campaign for the education of anticorruption behaviour;
Specific objective 3 -  Training the employees of the Constanţa City Hall in the field of anticorruption, ethics and integrity (40 persons).



Results 

- Guide /manual of good practices, standards of ethics and integrity;
- Elaborated operational procedure;
- Anticorruption education campaigns;
- 40 persons from the Constanța City Hall certified at the end of the courses in the field of corruption prevention, transparency, ethics and integrity.
Procedura în vederea implementarii măsurilor anticorupție
Manual de bune practici, standarde de etică și integritate
Pliant angajați
Pliant cetățeni


11. INCREASING THE ADMINISTRATIVE CAPACITY OF CONSTANȚA MUNICIPALITY BY IMPLEMENTING AND MAINTAINING THE QUALITY MANAGEMENT SYSTEM ISO 9001 
Financing Source

“Project co-financed by the European Social Fund, through the Operational Programme Administrative Capacity 2014-2020”

MySMIS code/ project code 

MySMIS 109686/SIPOCA 122

Beneficiary  Administrative Territorial Unit Constanța Municipality
   

Total value of the project

TTotal eligible value of the project – 422,917.67 lei;
Eligible co-financing of the beneficiary – 8,458.35 lei;
Non-refundable eligible amount from ESF – 359,480.02 lei;
Non-refundable eligible amount from national budget – 54,979.30 lei;

completion date

24.10.2019




Objectives

General objective – Implementation and certification of the quality management system in accordance with the provisions of the standard SR EN ISO:2015.
Specific objectives
Specific objective 1 – Reviewing and optimisation of the internal work flows;
Specific objective 2 – Implementing the  quality management system in accordance with the provisions of the standard SR EN ISO 9001:2015;
Specific objective 3 – Promoting modernisation in the local public administration of Constanța Municipality, by specialising the City Hall employees on topics specific to quality management (551 persons).

Results  - Quality management system ISO 9001 implemented in the City Hall of Constanța Municipality;
- Staff of the local public administration of Constanța municipality trained on topics specific to quality management in public administration.
 certification   ISO 9001:2015

12. PARTNERSHIP – ACTION PLAN REGARDING AIR QUALITY

Financing source

European Commission / Government of Netherlands 

Partners 

Member states: Netherlands (coordinator), Croatia, Sweden;
Cities: London, Utrecht, Milan, Constanța;
European institutions: European Commission, Eurocities, Urbact, Joint Research Centre

Financing contract

Volunteer participation

Project completion date

15.03.2019

Objective

Identification of issues regarding the air quality and the impact on health, especially in the urban area. The partnership is part of the Urban Agenda of the European Union and implies an exchange of information and good practices between partner states.

 Results  Result 1: Establishing the information regarding the air quality and the influence on health – situations specific to each city;
Result 2: Identification of the financing sources and the regulations on air quality in order to establish the contradictions / lacks / specific examples in the legislation;
Result 3: Presenting examples of good practices in the field of air quality;
Result 4: Elaborating a Guide for cities that want to create an action plan regarding air quality. This Guide shall include the best examples of both legislation and implemented actions.(coordinator Constanṭa and Milan).

13. “IMPROVEMENT OF THE ACCESS BETWEEN CONSTANȚA MUNICIPALITY AND NĂVODARI INDUSTRIAL PLATFORM BY WIDENING AND MODERNISING THE MAMAIA-NĂVODARI BOULEVARD”

Financing source

Regional Operational Programme 2007-2013 - Axis 1.1.

Beneficiaries

Administrative Territorial Unit Năvodari
Administrative Territorial Unit Constanţa Municipality

Financing contract

3535/04.12.2012

Total value of the project

57,943,411.05 lei  

Project completion date

01.11.2016

Objectives

 

Improvement of the access between Constanța Municipality and Năvodari industrial platform by widening and modernising the Mamaia-Năvodari Boulevard, development and valorisation of the economic potential of the area, increase of the accessibility level of the city of Năvodari in order to valorise the touristic potential of the area and increasing its role in the development of Constanța County.

Results

Rehabilitated and modernised urban streets – 6,3 km. 

14. “SENIORS PARK -EXTENDING THE RETIREMENT HOME BY A NEW BUILDING”

Financing source

Regional Operational Programme 2007-2013 - Axis 1.1.

Beneficiaries

Administrative Territorial Unit Constanţa Municipality

Financing contract

3347/17.08.2012

Total value of the project

4,849,595.99  lei, out of which 3,716,384.73 lei non-refundable amount

Project completion date

01.11.2016

Objectives

 

Rehabilitation works for the retirement home and its extension by a new building P+2E [*ground floor + 2 floors] having the functions of administrative areas, accommodation areas, medical practice areas, socialisation area, storage areas.

Results

The accommodation capacity has been increased by 48 seats, out of which 28 seats in the new building and 20 seats created as a result of the fact that the offices and medical practices were moved from the old accommodation building in the new building, in the rooms having this destination.

15. “REHABILITATION AND MODERNISATION OF PUBLIC LIGHTING IN SOME LOCALITIES OF THE CONSTANŢA METROPOLITAN AREA.”

Financing source

Regional Operational Programme 2007-2013 - Axis 1.1.

Beneficiaries

Administrative Territorial Unit Constanţa Municipality

Financing contract

5052/27.02.2015

Total value of the project

32,296,166.58 lei, out of which 31,461,099.79 lei non-refundable amount

Project completion date

31.10.2016


16. BLACK SEA BIKE - DIVERSIFICATION OF THE TOURISM SERVICES IN CONSTANTA - BALCHIK CROSS BORDER REGION BY BIKE - BSB
Financing source

Operational Programme for Cross-border Cooperation Romania-Bulgaria 2007-2013;

Beneficiary Administrative Territorial Unit Constanța Municipality; 
   
Partner Balchik Municipality, Bulgaria
   
Financing contract  34544/26.04.2013
   

Total eligible value of the project 

1,498,533.24 euro

Value from the Administrative Territorial Unit Constanța Municipality 

1,180,618.24 euro, out of which:
- own co-financing: 25,737.48 euro (2,18%)

   
Completion date   15.09.2016
   
Objective

Diversification of the touristic services by creating a network of bicycle stations in the cities of Constanța and Balchik.

Results

- 24 bicycle stations Constanța Municipality, 6 bicycle stations in Balchik.
- 390 bicycles purchased for Constanța Municipality and 100 bicycles purchased for Balchik Municipality, which shall be provided for the users free of charge.


17. BUILDING A MULTILEVEL PARKING P+7E+T [*GROUND FLOOR + 7 FLOORS + TERRACE]‚ IN MAMAIA RESORT, CASINO-ALBATROS AREA”

Financing source

Regional Operational Programme 2007-2013 - Axis 1.1..

Beneficiaries

Administrative Territorial Unit Constanţa Municipality

Financing contract

3767/18.07.2013

Total value of the project

14,281,544.79 lei, out of which  13,995,913.89  lei non-refundable amount

Project completion date

30.06.2016

Objectives

 

Development of the urban public infrastructure in order to modernise the public services in general and the touristic services in special, by building a multilevel parking P+7E+T in Mamaia Resort, Casino-Albatros area.

Results

394 new parking spaces

18. INTEGRATED MEASURES FOR EQUALITY OF CHANCES

Financing source

Sectoral Operational Programme Human Resources Development 2007-2013 - Axis 6 “Promoting social inclusion”

Beneficiary

Administrative Territorial Unit Constanța Municipality

Partners

“Ovidius” University of Constanța and the Institute for Human Resources Development

Financing contract

Sectoral Operational Programme Human Resources Development no. 146/6.3/G/130592/29.04.2014

Contract value

1,990,385 lei

Project completion date

 

15.12.2015

Objective  Facilitating access on the labour market for vulnerable groups (women) and building a professional career in the context of promoting an inclusive society for the welfare of women in the urban and rural environment of the South – East region. 
   

Results

588 women trained/qualified through the following courses: human resources inspector, trade worker, baby-sitter, English language and social and civic skills.
web-site: www.egalitate-de-sanse.ro

19. MAMAIA TOURIST PROMENADE

Financing source

Regional Operational Programme 2007-2013–Axis 1.1.

Beneficiary

Administrative Territorial Unit Constanța Municipality

Financing contract

3348/17.08.2012

Contract value

68,685,880.49 lei, out of which 48,317,628.50 lei non-refundable amount

Project completion date

 

17.08.2015 

Results

Modernisation and restoration of the tourist promenade of Constanţa Municipality – Vacation Village area and Mamaia Resort:
Rehabilitation of the main pedestrian alley of the Vacation Village;
Rehabilitation and restoration of Perla plaza; 
Rehabilitation and restoration of Malibu – Perla – Mamaia Casino promenade; 
Rehabilitation and modernisation of Mamaia Casino promenade and plaza; 
Rehabilitation and restoration of Club Castel Casino promenade – up to the vicinity of Vega hotel;
1,090 new parking spaces and 126,102 m2 of restored and furnished promenade (benches, garbage cans, lighting poles etc.).


20. INTEGRATED RESTORATION OF THE PEDESTRIAN AREA IN THE HISTORICAL CENTRE OF CONSTANŢA MUNICIPALITY

Financing source

Regional Operational Programme 2007-2013–Axis 1.1.

Beneficiary

Administrative Territorial Unit Constanța Municipality

Financing contract

3034/10.05.2012 

Contract value

37,934,638.30 lei out of which 29,807,506.65 lei non-refundable amount

Project completion date 

10.06.2015 

Results

Rehabilitation of the urban infrastructure in the historical centre of Constanţa Municipality by: Rehabilitating a number of 21 streets in the Peninsular area of Constanţa Municipality; Creating/ rehabilitating the rain water sewerage system associated with the rehabilitated streets; Providing urban furniture for the area: lighting poles, road signs, garbage cans, ashtrays.


21. “RESTORATION AND REARRANGEMENT OF THE PROMENADE AND GREEN AREAS IN THE VRAJA MĂRII – CASINO – TOMIS PORT AREA”

Financing source

Regional Operational Programme 2007-2013–Axis 1.1.

Beneficiary

Administrative Territorial Unit Constanța Municipality

Financing contract

3030/10.05.2012 

Total value of the project

12,370,510.26 lei, out of which 12,123,100.06  lei non-refundable amount

Project completion date 

10.11.2014

Results

Rehabilitation of the urban public infrastructure in the historical area of Constanţa Municipality by: Repairs and restoration of support walls, guard rail; Arrangement of promenade alley; Modernisation of pedestrian alleys in the park and arrangement of green areas; Urban furniture (kiosks, gazebos, benches, fountains and drinking fountains, lighting poles).


22. IMPROVE ACCESS TO THE MAMAIA RESORT BY BUILDING PEDESTRIAN WALKWAYS

Financing source

Regional Operational Programme 2007-2013–Axis 1.1.

Beneficiary

Administrative Territorial Unit Constanța Municipality

Financing contract

3256/23.07.2012

Contract value

11,067,838.24 lei, out of which 8,392.273.32 lei non-refundable mount

Project completion date 

23.06.2014

Results 

Three pedestrian catwalks located in the areas: Vacation Village, Casino and Rex.


23. “RESTORATION AND INTEGRATED RE-ARRANGEMENT OF THE HISTORICAL AREA – OVIDIU SQUARE”

Financing source

Regional Operational Programme 2007-2013 - Axis 1.1.

Beneficiaries

Administrative Territorial Unit Constanţa Municipality

Financing contract

3031/10.05.2012

Total value of the project

10,581,294.13 lei, out of which 8,494,477.56 lei non-refundable amount

Project completion date 

10.05.2014

Results 

Rehabilitation of the degraded urban public infrastructure of the Historical Centre of Constanța Municipality by rehabilitating the following objectives: Ovidiu Square; Streets: Vasile Canarache, Marcus Aurelius and Aleea Vasile Canarache; 
Access stairs:
a) from Marcus Aurelius Street to Tomis Port;
b) Vasile Canarache Steet to Termele Romane Street;
Urban furniture: benches, lighting poles, garbage cans, ashtrays.
Rain water sewerage; Public lighting system; Green areas - embankments.


25. CONSTANȚA, FIRST STEP OF YOUR LONG JOURNEY – PROMOTING THE CONSTANȚA MAMAIA TOURISTIC AREA

Financing source

Regional Operational Programme 2007-2013 - Axis 5.3.

Beneficiaries

Administrative Territorial Unit Constanţa Municipality

Partners  Black Sea / Danube Delta Tourism Promotion Association 

Financing contract

1375/05.04.2011

Contract value

1,036,640 lei 

Project completion date 

04.04.2013 

Objective 

Valorisation of the cultural, historical and natural heritage of the Constanța – Mamaia touristic area, extending the general perception of “vacation in the sun at the seaside” to “knowledge vacation”, on three touristic topics: 
Knowledge tourism;
Historical, architectural and religious cultural tourism;
Recreational, nature and biodiversity tourism.  

Results 

1,640.000 flyers;
4,000 brochures;
Creating the web-site: www.constanta-turistica.ro


25. “GREEN PARKING – BUILDING A MULTILEVEL PARKING IN THE CONSTANȚA COUNTY EMERGENCY CLINICAL HOSPITAL AREA, CONSTANȚA COUNTY”
Financing source

Regional Operational Program 2007-2013- Axis1.1.

Beneficiaries Constanta Municipality

Financing contract

1517/20.04.2011

Total value of the project

12,186,543.36 lei, out of which 11,942,812.49 lei non-refundable amount

Project completion date

20.09.2012

Results

265 parking spaces were created


26. “REHABILITATION OF THE RETIREMENT HOME – UTILITIES AND CANTEEN BUILDING”
Financing source

Regional Operational Programme 2007-2013 - Axis 3.2.

Beneficiary

Administrative Territorial Unit Constanţa Municipality

Partner

Retirement home in Constanța

Financing contract

611/29.01.2010

Total value of the project

3,189,125.29 lei, out of which 1,725,465.91 lei non-refundable amount 

Project completion date

20.04.2011

Results

Installation replacement (telephone, fire signalling , intercom);
Trim restoration;
Heating installation replacement;
Electrical, sanitary, ventilation installation replacement in the canteen and laundry room;
Equipment with food preparation facilities;
Equipment with laundry room facilities.


27. EUROPEAN ADMINISTRATION 
Financing source

PODCA 2007-2013 – Axis 1

Beneficiary
Constanta Municipality

Partners  Intercommunity Development Association "Constanta Metropolitan Area"
Financing contract 384780/17.03.2009
Contract value 248.746,20 lei, nonrefundable: 228.320,4 lei 
Completion date 17.03.2010
Results

150 trained civil servants, who operate in the 14 municipalities of the cities that make up the metropolitan area of Constanta, in the fields of project management, public procurement, human resources, social and civic competences and internal audit.


28. REGIO-LLL  
Financing source

Leonardo da Vinci Programe- Networks section

Beneficiary FREREF – Fondation des Regions Europeennes pour la Recherche en Education et en Formation
Partners  Constanta Municipality; Andaluza Fondo de Formacion y Empleo Foundation – Sevilla (Spain); Generalitat de Catalunya – Departament D’EDUCACIÓ – Barcelona (Spain); Servei d’ocupació de Catalunya. Department de Treball – Barcelona (Spain); Confédération Française des Travailleurs Chrétiens – CFTC Rhône – Alpes – Lyon (France); Chambre des Métiers et de l’Artisanat du Rhône – CMA 69 – Lyon (France); Centre National de la Recherche Scientifique – CNRS – Paris (France); Conseil Régional de Lorraine – Metz ( France); Conseil Régional de Rhône – Alpes – CHARBONNIERES LES BAINS (France); Université de Bretagne Sud – Lorient (France); Agenzia Regionale Istruzione Formazione Lavoro – Regione Lombardia – Milan (Italy); Centro Interateneo per l’Innovazione, la ricerca didattica e la formazione avanzata – Venice (Italy); Ministère de l’Education et de la Formation professionnelle du Grand-duché de Luxembourg/Service de la Formation professionnelle – Luxemburg; Województwo Małopolskie- Cracow (Poland); Conférence Intercantonale de l’Instruction Publique de la Suisse romande et du Tessin –Neuchatel. 
Financing contract 2007-1985/001-001
Contract value 623.568 euro, nonrefundable
Completion date 2010
Results

Papers, essays and case studies on promoting the transfer of best practices across interregional levels and policy implementation "Lifelong Learning", according to the Lisbon Strategy.


29. “REHABILITATION OF THE RETIREMENT HOME IN CONSTANȚA”
Financing source

Regional Operational Programme 2007-2013 - Axis 3.2.

Beneficiary

Administrative Territorial Unit Constanţa Municipality

Partner

Retirement home in Constanța

Financing contract

33/20.02.2009

Total value of the project

2,885.820.69 lei, out of which  2.823,635.81 lei non-refundable amount

Project completion date

20 February 2010

Results

Restoration of bathrooms; restoration of the existing electrical installations;
Rehabilitation of elevators;
Restoration of the existing terrace by replacing the cover;
New building for water pumping system;


30. SUSTAINABLE OPERATIONAL PARTENERSHIP (POD) CONSTANȚA-DOBRICH
Financing source

Program CBC RO-BG 2006 – Priority  4 “People to people”

Beneficiary Constanta Municipality
Partner  Dobrich Municipality
Financing contract RO2006/018-405.01.04.19
Contract value 43.519 euro,  nonrefundable: 35.359 euro 
Completion date 2009
Results

25 civil servants from Constanta Metropolitan Area and Dobrich District were trained in the fields of project cycle management; rules and procedures on the Structural Funds and the peculiarities of cross-border cooperation;
A portfolio of projects that can be implemented within the Operational Programme CBC Romania - Bulgaria 2007-2013;
A permanent working group composed of civil servants participating at the training.


31. uRBAMECO 
First stage
Financing source URBACT I 2002-2006 Programme
Beneficiary Grand Lyon (France)
Partners Constanța Municipality; Goteborg Municipality, Sweden; Birmingham Municipality, Great Britain; Belfast Municipality , Ireland; Arnhem Municipality, Holland; Lodz Municipality, Poland; Pila Municipality, Poland; Wroclaw Municipality, Poland; Nea Ionia Magnesias Municipality, Greece.
REF 1750/FT
Contract value 98.100 euro,  nonrefundable
Completion date 2008
Results

Local Action Plans, case studies, best practice recommendations

Second stage  
Financing source URBACT II 2007-2013 Programme
Beneficiary Grand Lyon (France)
Partners Constanța Municipality; Goteborg Municipality, Sweden; Birmingham Municipality, Great Britain; Belfast Municipality , Ireland; Arnhem Municipality, Holland; Lodz Municipality, Poland; Pila Municipality, Poland; Wroclaw Municipality, Poland; Nea Ionia Magnesias Municipality, Greece.
REF 1750/FT
Contract value 594.975 euro, nonrefundable: 542.500 euro
Timeframe project 2008-2009
Completion date 2009
Results Local Action Plans, case studies, best practice recommendations

32. PHARE CBC „ECO”
Financing source PHARE CBC 2005 Programe – People to People
Beneficiary Constanta County School Inspectorate
Partners  Constanța Municipality; Dobrich Municipality
Associations  S.C. Gremlin Computers S.R.L.; EcoRomAmbalaje; MM Recycling; Eco Dobrogea; Eco ZOO Dobrich
Contract value 54.870 euro, nonrefundable
Completion date 2008
Results

Environmental awareness among students;
Selective collection of packaging waste by the schools from Constanta and Dobrich, ecological summer camp.


33. BLACK SEA tOURISM
Financing source PHARE CBC 2005 Program – People to People
Beneficiary Travel agencies in Romania; citizens of the region Dobrich and Constanta County; tourists
Partners Constanța Municipality; Dobrich Municipality
Financing contract RO2005/017-535.01.03.09
Contract value 53.256 euro,  nonrefundable: 47.930,4 euro
Completion date 2008
Results

A study on the current situation of the seaside tourism in Romania and Bulgaria;
Setting up an association for the development and promotion of tourism at the Black Sea, in order to strengthen relations of cooperation in tourism between the regions of Dobrich and Constanta (Bulgaria);
It was awarded by the European Commission in the final conference Concertour draft - Accessibility, Strategies, Solutions and Services for improving the European Sustainable Tourism, held in Rome on 25.09.2009.


34.  iMAPS
Financing source INTERREG III C PROGRAMME
Beneficiary Brest Urban Community, France
Partners

Constanța Municipality; Technology Park Brest, France; Department of Fire and Emergency Situations, Brest, France; Matosinhos Municipality, Portugal; Institute of Water Northern Region, Matosinhos, Portugal; Taranto Municipality, Italy; Autoritatea Portuară, Taranto, Italia; Ovidius University, Constanța; Local Council Cadiz, Spain; Cadiz Univerity, Spain; Port authority Gijon, Spain; Local Council Isle of Wight, United Kingdom

Contract value 992.000 euro, nonrefundable: 979.500 euro
Completion date 2007
Results

Creating a network of exchanges between the port cities facing similar problems.


35. E-PMC
Financing source PHARE 2002 - PROGRAMME
”The modernization fund for the development of local government and local budget”
Beneficiary Constanța Municipality
Financing contract RO2002/000-586.03.02
Contract value 40.000 euro, nonrefundable: 38.000 euro
Completion date 2005
Results

Modernization of document management and operational management by implementing the electronic signature system.


36. CLEANER PRODUCTION AND ENERGY EFFICIENCY
Financing source Government of Norway
Beneficiary Economic operators from the city and county of Constanta
Partners Constanța Municipality; Norwegian Energy Efficiency Group; The Norwegian Society of Chartered Technical and Scientific Professionals; Pollution Prevention Center in Bucharest
Contract value 100.000 euro nonrefundable
Completion date 2005
Results

On-land training; training  for Romanian instructors; Manuals on quality management and environmental management 


37. TAPESTRY
Financing source General Directorate for Energy and Transport of the European Commission (DGTREN)
Beneficiary Direct autonomous transport – Constanța Municipality 
Partners Transport and Travel Research Ltd., United Kingdom; Transport Studies Group, University of Westminster, United Kingdom; Hampshire County Council, United Kingdom; Herdfordshire County Council, United Kingdom; Langzaam Verkeer, Belgium; TISPT Consultores Em Transportes Inovacao e Sistemas SA, Portugal; Aristotle University of Thessaloniki, Greece; Asstra-Associatione Transporti, Italy; Citta di Torino, Italy; Romanian Union of Public Transport, Romania; Constanța Municipality, Romania; Interactions Ltd, Irland; Communaute Urbaine de Nantes, France; T.E.Marknadskommunikation A.B., Sweden
Contract value 3000.000 euro, nonrefundable
Completion date 2002
Results

Development and implementation of case studies in areas such as:
1. Intermodal transportation;
2. Repositioning of the public transport;
3. Health and Environment.