I. EU - FUNDED PROJECTS- SUBMITTED TO EVALUATION
Financing source |
Large Infrastructure Operational Programme 2014-2020, Axis 9, Specific objective 9.1 Increase the capacity to manage the COVID-19 health crisis
|
|
|
Beneficiary |
Administrative Territorial Unit Constanța Municipality
|
|
|
General objective |
The general objective of the project aims to ensure an adequate capacity to manage the health crisis at the level of 92 non-university schools in Constanța, by equipping them with medical protection equipment and medical devices necessary to reduce the risk of spreading SARS-CoV-2 infection.
|
Date for submitting the financing application
|
16.12.2020
|
Suggested implementation period |
7 months |
II. EU - FUNDED PROJECTS - STAGE PRECONTRACTING/CONTRACT
III EU-FUNDED PROJECTS - IN IMPLEMENTATION
Financing source |
Competitiveness Operational Programme 2014-2020, Axis 2: Information and Communication Technology (ICT) for a competitive digital economy, Specific objective 2.4 Increase the use of Internet
|
|
|
Beneficiary |
Administrative Territorial Unit Constanţa Municipality
|
|
|
General objective |
The general objective of the project is to facilitate access to on-line education in the context of the SARS-CoV-2 pandemic, by endowment of secondary schools in Constanța with IT mobile equipment such as school tablets, as well as other equipment / electronic devices necessary for on-line teaching activity in right conditions, in the school year 2020/2021.
|
Date for submitting the financing application
|
16.11.2020
|
Suggested implementation period |
12 months |
Financing source |
Large Infrastructure Operational Programme 2014-2020, Axis 7, Specific objective 7.1 Increase of the energy efficiency in centralized heat transmission and distribution systems in selected cities
|
Beneficiary |
Administrative Territorial Unit Constanţa Municipality
|
Financing contract |
889 / 31.01.2022 |
Total value of the project |
116.136.102,77 lei, out of which eligible value 97.804.515,67 lei |
General objective |
The general objective of this project is to increase the energy efficiency of the heating system in the Municipality of Constanța, by reducing thermal energy losses in the primary heating networks.
|
Suggested implementation period |
31.01.2022 – 31.12.2023 |
Financing source |
Large Infrastructure Operational Programme 2014-2020, Axis 7, Specific objective 7.1 Increase of the energy efficiency in centralized heat transmission and distribution systems in selected cities
|
|
|
Beneficiary |
Administrative Territorial Unit Constanţa Municipality
|
Financing contract |
822 / 13.01.2022 |
Total value of the project |
115.405.074,99 lei, out of which eligible value 97.189.192,26 lei |
General objective |
The general objective of this project is to increase the energy efficiency of the heating system in the Municipality of Constanța, by reducing thermal energy losses in the primary heating networks
|
Suggested implementation period |
13.01.2022 - 31.12.2023 |
Financing source |
Large Infrastructure Operational Programme 2014-2020, Axis 9, Specific objective 9.1 Increase the capacity to manage the COVID-19 health crisis
|
Beneficiary |
Administrative Territorial Unit Constanţa Municipality
|
Financing contract
|
706/16.11.2021
|
Total value of the project
|
14.578.935,74 lei, out of which eligible value 14.570.576,74 lei |
General objective |
The general objective of this project is to strengthen and increase the capacity to manage the emergency situation caused by the COVID-19 health crisis at the Clinical Hospital of Infectious Diseases Constanța, by creating a modular hospital to supplement the capacity for day hospitalization (emergency reception space ans isolation of patients suspected / confirmed with virus). |
Suggested implementation period
|
23.02.2021 – 30.06.2023 |
Financing source |
Regional Operational Programme 2014-2020, Axis 3, Investments priority 3.1.B-Public buildings/Call 2/NE, SE, SM
|
Beneficiary |
Administrative Territorial Unit Constanta Municipality
|
Financing contract |
7290/25.11.2021 |
|
|
General objective |
The general objective of this project is the increase of the energy efficiency of Mircea cel Bătrân National College building, by implementation of a set of measures to optimize the energy consumption of the building and to align to the European performance standards and requirements.
|
|
|
Total value of the project |
19.398.470,14 lei, out of which eligible value 13.880.117,17 lei |
Value of eligible co-financing (2%)
|
277.602,35 lei
|
Suggested implementation period |
25.11.2021 – 31.12.2023
|
Financing source |
Environmental fund administration – „The programme regarding reducing green house gas emision in transports through promoting the infrastructure for non poluting vehicles in terms of energy: electric vehicle charging in all county capital "
|
|
|
Beneficiary |
Administrative Territorial Unit Constanţa Municipality
|
Financing contract |
2/GES/02.11.2021 |
Total value of the project |
4.414.727,55 lei, out of which eligible value 3.839.573,41 lei |
General objective |
To reduce the green house gas emision generated by vehicle traffic by developing the infrastructure for electric charging by mouting 18 vehicle electric charging stations.
|
Suggested implementation period |
02.11.2021 - 01.11.2022 |
Financing source |
Regional Operational Programme 2014-2020, Axis 3, Investments priority 3.1.B-Public buildings/Call 2/NE, SE, SM
|
Beneficiary |
Administrative Territorial Unit Constanta Municipality
|
Financing contract |
6816/02.04.2021 |
General objective |
The general objective of this project is the increase of the energy efficiency of Decebal Theoretical High School building, by implementation of a set of measures to optimize the energy consumption of the building and to align to the European performance standards and requirements
|
Total value of the project |
13.644.198,43 lei, out of which eligible value 11.100.255,91 lei |
Value of eligible co-financing ( 2% )
|
222.005,12 lei
|
Suggested implementation period |
02.04.2021 - 30.09.2023
|
Financing source |
Regional Operational Programme 2014-2020 - Axis 4/ Investment priority 4.4
|
Beneficiary |
Administrative Territorial Unit Constanta Municipality
|
Financing contract |
6737/05.03.2021 |
General objective |
By rehabilitating, modernising and equipping “MUGUREL” full-day kindergarten of Constanța Municipality, the aim is to ensure that the educational activities intended for pre-school education are carried out in optimum conditions, at standards comparable with those of the European Union.
|
Total value of the project |
3.987.982,84 lei out which eligible value 3.913.739,39 lei |
Value of eligible co-financing (2%)
|
78.274,79 lei |
Suggested implementation period |
05.03.2021 – 31.07.2023
|
Financing source |
Regional Operational Programme 2014-2020, Axis 3, Investments priority 3.1.B-Public buildings/Call 2/NE, SE, SM
|
Beneficiary |
Administrative Territorial Unit Constanta Municipality
|
Financing contract |
6701/26.02.2021 |
General objective |
The general objective of this project is the increase of the energy efficiency of Traian Theoretical High School building, by implementation of a set of measures to optimize the energy consumption of the building and to align to the European performance standards and requirements.
|
Total value of the project |
13.378.737,47 lei out of which eligible value 10.811.964,95 lei |
Value of eligible co-financing (2%) |
216.239,30 lei |
Suggested implementation period |
26.02.2021-30.06.2023
|
Financing source |
Regional Operational Programme 2014-2020 Priority axis 4, Investment priority 4e
|
Beneficiary
|
Administrative Territorial Unit Constanţa Municipality
|
Financing contract |
6690/22.02.2021 |
General objective |
The general objective of the project is the promotion of sustainable urbane mobility by the urban regeneration of the historic area of Constanța Municipality through a series of measures which lead to the increase of pedestrian mobility. Moreover, the intention is to make the use of motor vehicles in the historic centre of the municipality less attractive. Therefore, by rehabilitating some streets and by restricting the access for personal motor vehicles in this area of Constanța Municipality, the aim is to improve the sustainable urbane mobility, as well as to reduce the CO2 equivalent emissions.
|
Total value of the project |
26.443.554,43 lei out of which eligible value 25.317.651,31 lei |
Value of eligible co-financing (2%)
|
506.353,03 lei |
|
|
Suggested implementation period |
22.02.2021 - 30.11.2023 |
|
|
Financing source |
Joint Operational Programme "Black Sea Basin" 2014-2020
|
Leader |
Cekmekoy Municipality – Turkey ; |
|
|
Partners |
Administrative Territorial Unit Constanța Municipality, together with entities from Greece, Bulgaria and Ukraine;
|
Total value of the project
|
1.448.754,24 euro
|
Value of partner
Administrative Territorial Unit Constanța Municipality
|
- total eligible value: 213.750 euro;
- non-refundable eligible amount from ENI: 196.650 euro (92%);
- eligible co-financing: 17.100 euro (8%).
|
Implementation period |
25.12.2020 – 24.12.2022
|
General objective |
Setting up and developing structures and networks for designers, entrepreneurs, academicians and artists operating in the field of cultural and creative industries (CCIs) in the Black Sea Basin.
|
Results
|
5 co-working spaces established and endowed in partner locations (1 space/partner), 86 mass-events organized for collaboration of people from CCIs. |
Financing source |
Large Infrastructure Operational Programme 2014-2020, Axis 9, Specific objective 9.1 Increase the capacity to manage the COVID-19 health crisis
|
Leader |
Administrative Territorial Unit Constanța Municipality
|
Partner |
Clinical Hospital for Infectious Diseases Constanța |
Financing contract |
380 / 02.10.2020
|
General objective |
The general objective of this project is to strengthen and increase the capacity to manage the emergency situation caused by the COVID-19 health crisis at the Clinical Hospital of Infectious Diseases Constanța, by providing medical and personal protection equipment necessary to ensure appropriate treatment for all patients infected with SARS-CoV-2 and to reduce the risk of contamination of hospital staff and patients.
|
Total value of the project
|
22.681.089,84 lei, from which eligible value 22.672.404,84 lei (100% FEDR financing) |
Suggested implementation period |
02.10.2020 – 30.06.2022
|
Financing source |
Regional Operational Programme 2014-2020 - Axis 4/ Investment priority 4.4, specific objective 4.5
|
Financing contract |
5797/28.07.2020 |
Beneficiary |
Administrative Territorial Unit Constanta Municipality
|
General objective |
Increase of the educational infrastructure relevant for the labour market in Constanța Municipality, as determining factor for the increase of the educational process quality, early development of children, for building social skills and the social integration capacity. |
|
|
Total value of the project |
10.247.493,19 lei, out of which eligible value 10.236.783,19 lei |
Value of eligible co-financing (2%)
|
204.880,87 lei |
Suggested implementation period |
28.07.2020 - 28.02.2023
|
Financing source |
Project co-financed by the European Social Fund, through the Operational Programme Administrative Capacity 2014-2020
|
MySMIS code/ project code |
MySMIS 2014: 135502/ SIPOCA 849 |
Beneficiary |
Administrative Territorial Unit Constanta Municipality
|
Partner
|
Intercommunity Development Association "Constanța Metropolitan Area" |
Total value of the project |
Total eligible value of the project - 3.699.711,30 lei;
Beneficiary’s eligible co-financing - 53.674,95 lei (2%);
Partner’s eligible co-financing - 20.319,28 lei (2%);
Valoare eligibilă nerambursabilă din FSE - 3.127.483,22 lei;
Valoare eligibilă nerambursabilă din bugetul național - 498.233,85 lei.
|
Implementation period
|
20.07.2020 - 19.01.2023
|
Objectives |
The general objective of the project is to improve the administrative capacity at the level of Administrative Territorial Unit Constanţa Municipality and its entire Functional Urban Area, by developing the capacity of integrated strategic planning, streamlining the management processes and simplifying administrative procedures, in order to respond, in a fundamental and coherent way, to local communities needs.
Specific objectives
Specific objective 1 - Development of strategic planning capacity at the level of Administrative Territorial Unit Constanţa Municipality and Constanţa Metropolitan Area, by updating the Integrated Urban Development Strategy and the portfolio of priority projects of Constanța Metropolitan Area;
Specific objective 2 – Streamlining and simplifying of services provided to citizens by Administrative Territorial Unit Constanţa Municipality through a ”shared skills” computer system and further retro-digitization archive;
Specific objective 3 - Strengthening the institutional capacity of Administrative Territorial Unit Constanţa Municipality and other local public authorities in the Constanţa Metropolitan Area, by adequately training staff in the field of strategic planning and efficient public management.
|
Results |
- Updated Integrated Urban Development Strategy and portfolio of priority projects of the Constanța Metropolitan Area;
- Achieved ”shared skills” computer system;
- Electronic archive made for at least 900 linear meters physical archive;
- 44 trained persons at Constanța Metropolitan Area level.
|
Financing source |
Regional Operational Programme 2014-2020 Priority axis 4, Investment priority 4e
|
Beneficiary |
Administrative Territorial Unit Constanţa Municipality
|
Grant contract
|
5568/11.06.2020
|
|
|
General objective
|
The general objective of the project is to improve the urban mobility in Constanța Municipality, by a re-systematization of the transport infrastructure on 1 Mai Blvd. and Șoseaua Mangaliei Road. In order to encourage the use of more environment-friendly transport means, some lanes dedicated to public transport and to bicycles will be introduced and the roadway and sidewalks will be rehabilitated. The purpose of these interventions is mainly to reduce the GHG emissions and to promote sustainable urban mobility by making investments in the urban public transport infrastructure and in the infrastructure specific for travelling by foot and by bicycle, in order to ensure a free and safe movement of people. All these shall lead to the improvement of the environmental conditions and life quality for the citizens and visitors of Constanța Municipality.
|
Total value of the project
|
69.800.962,02 lei
|
Value of eligible co-financing (2%)
|
1.396.019,24 lei
|
Proposed implementation period |
11.06.2020 - 31.07.2023
|
Financing source |
Regional Operational Programme 2014-2020 - Axis 4/ Investment priority 4.5
|
Beneficiary |
Administrative Territorial Unit Constanta Municipality
|
Financing contract |
5352/30.04.2020
|
General objective |
Rehabilitation, modernization and equipment of C3 Corps of Technological High School Dimitrie Leonida (the canteen restord in workshops), in order to ensure the operation of secondary technological education activities in optimal conditions, at standards comparable to those in the European..
|
Total value of the project |
7.777.842,86 lei |
Value of the eligibile cofinancing (2%)
|
153.103,27 lei |
Suggested implementation period |
01.05.2020 - 31.12.2022
|
Financing source |
Regional Operational Programme 2014-2020 - Axis 3/ Investment priority 3.1.B -SUERD/1
|
Beneficiary |
Administrative Territorial Unit Constanţa Municipality
|
Financing contract |
5336/30.04.2020
|
General objective |
The general objective of this project is the increase of the energy efficiency of the building where the State Theater operates, by implementation of a set of measures to optimize the energy consumption of the building and to align to the European performance standards and requirements.
|
Total value of the project |
4.863.953,22 lei |
Value of the eligibile cofinancing (2%) |
63.089,04 lei |
Suggested implementation period |
01.05.2020 - 30.11.2023
|
Financing source |
Regional Operational Programme 2014-2020 Priority axis 4, Investment priority 4e
|
Beneficiary
|
Administrative Territorial Unit Constanţa Municipality
|
Financing contract |
5224/06.04.2020 |
General objective |
The general objective of the project is the promotion of sustainable urbane mobility by the urban regeneration of the central area by a series of measures which lead to the increase of pedestrian accessibility and mobility in this area of the municipality. The aim of this project is to increase the modal share of moving by food and by bicycle, by transforming the segment of Ștefan cel Mare street in a modern pedestrian esplanade (sidewalks and shared-space areas), by rehabilitating the adjacent streets and by creating lanes dedicated to public transport and bicycle paths on Ferdinand Blvd. and Mircea cel Bătrân street. Moreover, the intention is to make the use of motor vehicles in the central area of the municipality less attractive. For this purpose, the access of personal/private motor vehicles in this area will be limited, which shall lead to the reduction of CO2 equivalent emissions.
|
Total value of the project
|
89.854.757,70 lei from which eligible value 89.854.757,70 lei |
Value of the eligibile cofinancing (2%) |
1.797.095,20 lei |
Suggested implementation period |
06.04.2020 - 30.06.2023 |
Financing source |
Regional Operational Programme 2014-2020 - Axis 3/ Investment priority 3.1.B -SUERD/1
|
Beneficiary |
Administrative Territorial Unit Constanta Municipality
|
Financing contract |
5172/24.03.2020
|
General objective |
Increase of the energy efficiency for the building where the 8 Secondary School of Constanța operates, by implementing a set of measures designed to optimize the energy consumption of the building and alignment to the European performance standards and requirements.
|
Total value of the project |
4.878.047,09 lei, from which eligible value 4.537.724,78 lei
|
Value of the eligibile cofinancing (2%) |
90.754,52 lei
|
Suggested implementation period |
24.03.2020 - 30.09.2023 |
Financing source |
Regional Operational Programme 2014-2020 - Axis 3/ Investment priority 3.1.B -SUERD/1
|
Beneficiary
|
Administrative Territorial Unit Constanţa Municipality
|
Financing contract |
5095/25.02.2020
|
General objective
|
Increase of the energy efficiency for the building where the 38 Secondary School, Dimitrie Cantemir of Constanța Municipality operates, by implementation of a set of measures to optimize the energy consumption of the building and to align to the European performance standards and requirements. |
Total value of the project |
5.406.111,64 lei, from which eligible value 4.735.030,83 lei |
Value of the eligibile cofinancing (2%) |
94.700,62 lei |
Suggested implementation period |
25.02.2020 - 30.09.2022 |
Financing source |
Regional Operational Programme 2014-2020, Priority axis 4, Investments priority 4e
|
Beneficiary |
Administrative Territorial Unit Constanţa Municipality
|
Grant contract
|
5091/17.02.2020
|
|
|
General objective
|
The general objective of the project is to improve the urban mobility in Constanța Municipality, by a re-systematization of the transport infrastructure on 1 decembrie 1918 Blvd. and Alexandru Lăpușneanu Blvd. In order to encourage the use of more environment-friendly means of transport, lanes dedicated to public transport and to bicycles will be introduced and the roadway and sidewalks will be rehabilitated. The purpose of these interventions is mainly to reduce the GHG emissions and to promote sustainable urban mobility through investments in the urban public transport infrastructure and in the specific infrastructure for travelling by foot and by bicycle, in order to ensure a free and safe movement of people. All of these will lead to the improvement of environmental conditions and life quality for the citizens and visitors of Constanța Municipality.
|
Total value of the project
|
91.361.641,40 lei
|
Value of eligible co-financing (2%)
|
1.827.232,84 lei
|
Proposed implementation period |
17.02.2020 - 30.04.2023
|
Financing source |
Regional Operational Programme 2014-2020 in partnership, Priority axis 4, Investment priority 4.4 Investments in education, in training, including professional training for the aquirement of skills and learning during lifetime, through the development of education and training infrastructures
|
Beneficiary |
Administrative Territorial Unit Constanţa Municipality
|
Financing order
|
5029/20.12.2019 |
General objective
|
By rehabilitating, modernising and equipping “AMICII” full-day kindergarten of Constanța Municipality, the aim is to ensure that the educational activities intended for pre-school education are carried out in optimum conditions, at standards comparable with those of the European Union
|
Total value of the project |
6.057.289,73 lei
|
|
|
Value of eligible co-financing (2%)
|
120.931,60 lei |
Suggested implementation period |
30.08.2018 - 30.06.2022
|
Financing source |
Regional Operational Programme 2014-2020 in partnership, Priority axis 4, Investment priority 4e
|
Leader |
Ministry of Public Works, Development and Administration
|
Partners
|
Admnistrative Territorial Unit Alexandria Municipality, Admnistrative Territorial Unit Brăila Municipality, Admnistrative Territorial Unit ConstanȚa Municipality, Admnistrative Territorial Unit Drobeta Turnu Severin Municipality, Admnistrative Territorial Unit FocȘani Municipality, U.A.T. Admnistrative Territorial Unit Slobozia Municipality
|
Financing order |
4817/04.11.2019 |
General objective
|
Acquisition of 21 electric buses of 10 meters length, 21 slow loading stations and 5 fast loading stations
|
Total value of the project for the Admnistrative Territorial Unit Constanta Municipality partner
|
56.388.223,95 lei
|
Value of eligible co-financing (2%)
|
968.164,48 lei
|
Proposed implementation period |
04.11.2019 -31.12.2022
|
Financing source |
Regional Operational Programme 2014-2020 in partnership, Priority axis 4, Investment priority 4e |
|
|
Leader |
Ministry of Regional Development and Public Administration
|
Partners |
Admnistrative Territorial Unit Constanta Municipality, Admnistrative Territorial Unit Alba Iulia Municipality, Admnistrative Territorial Unit Buzău Municipality, Admnistrative Territorial Unit Ploiești Municipality
|
General objective |
Acquisition of 20 electric buses with 12 meters length, 20 slow loading stations and 5 fast loading stations
|
The total value of the project for the partner U.A.T. Constanța |
65.733.918,25 lei
|
|
|
Eligible co-financing amount (2%) |
1.124.678,37 lei |
|
|
Suggested implementation period |
01.10.2019 - 28.02.2023 |
Financing source |
Regional Operational Programme 2014-2020 - Axis 2.1B
|
Beneficiary |
Administrative Territorial Unit Constanța Municipality |
Financing contract
|
4485/01.07.2019
|
General objective
|
Consists in creating a sectoral business incubator, intended for the sector of creative industries, in a building having the height capacity S+P+4E+M [*basement + ground floor + 4 floors + attic], located in Constanța Municipality, aiming to become the first regional hub for the entrepreneurial community involved in the sector of creative industries in the South – East region and to contribute to the growth of the regional competitiveness, to the generation of innovation and new skilled employment with competitive pay. The incubator shall provide high quality support services for the incubated companies and shall create mechanisms facilitating the transfer of experience, know-how and knowledge specific to successful business development, both by the new entrepreneurs of the creative industries, as well as by the entire entrepreneurial community in the South – East region.
|
Total value of the project |
14.028.656,56 lei, non-refundable amount 7.048.091,68 lei
|
Value of eligible co-financing 46,89%
|
6.222.491,68 lei
|
Suggested implementation period |
01.07.2019 - 31.03.2023 |
|
|
Financing source |
Regional Operational Programme 2014-2020 - Axis 10
|
Beneficiary |
Administrative Territorial Unit Constanța Municipality |
Financing contract |
4333/23.05.2019 |
General objective
|
The general objective of the project is to improve the quality of the educational infrastructure, namely the rehabilitation, modernisation, extension and endowment of 16 Secondary School “Marin Ionescu Dobrogianu” of Constanța in order to ensure an educational process at European standards, an increase of the participation of school population and adults to the educational process. |
Total value pf the project |
6.342.072,04 lei, non-refundable amount 6.327.181,12 lei
|
|
|
Value of eligible co-financing (2%)
|
126.543,67 lei |
Suggested implementation period |
23.05.2019 - 31.08.2022 |
Financing Source |
Project co-financed by the din European Social Fund, through the Operational Programme Administrative Capacity 2014-2020
|
MYSMIS code/ project code |
MySMIS 2014: 126409/ SIPOCA 551 |
|
|
Beneficiary
|
Administrative Territorial Unit Constanța Municipality |
|
|
Total value of the project |
Total eligible value of the project – 3,618,486.48 lei;
Eligible co-financing of the beneficiary – 72,369.73 lei (2%);
Non-refundable eligible amount from ESF – 3,075,713.52 lei;
Non-refundable eligible amount from national budget- 470,403.23 lei; |
|
|
Implementation period |
05.12.2018 - 04.01.2023
|
|
|
Objectives
|
The general objective consists in strengthening the administrative capacity of the Administrative Territorial Unit Constanța Municipality by developing the strategic planning capacity and by simplifying the administrative procedures, in correlation with the introduction of electronic methods for the management of administrative documents.
Specific objectives
Specific objective 1 - Development of the strategic planning capacity at the level of the local public administration of Constanţa Municipality by crating the Smart City Strategy for the municipality;
Specific objective 2 – Increasing the efficiency and simplifying the services provided for citizens by implementing a portal of digital services for citizens, documents management, ERP and partial digitalization of the archive;
Specific objective 3 - Promoting modernisation I nteh local public administration of Constanţa Municipality by specialising the city hall employees on topics specific to the project (strategic planning), which shall motivate and drive them towards innovation and providing quality public services for citizens.
|
Results |
– the Smart City Strategy of the a municipality is elaborated
– the analysis – diagnostic of the computer and document management system;
– developed and implemented integrated computer system;
– electronic archive for at least 1600 linear meters of physical archive;
– 10 persons trained in the field of strategic planning.
|
Financing source |
Regional Operational Programme 2014-2020 - Axis 3/ Investment priority 3.1.B -SUERD/1
|
Beneficiary |
Administrative Territorial Unit Constanta Municipality
|
Financin contract |
5141/12.03.2020
|
General objective |
Implementing a set of measures designed to optimize the energy consumption of the building and alignment to the European performance standards and requirements.
|
Total value of the project |
4.208.917,27 lei, from which eligible value 3.838.412,59 lei |
Completion date |
30.09.2020 |
Financing source |
EUROPEAN COMMISSION-AMIF-2017-AG-INTE |
|
|
Leader |
Comuni Di Lampedusa E Linosa, Italy
|
Partners |
Administrative Territorial Unit Constanța Municipality, together with entities from Romania, Italy, Austria, Hungary, Greece, Germany, Slovenia, Cyprus, Bulgaria, Belgium.
|
Total value of the project
|
786.869,22 euro |
General objective |
Increase the awareness of EU citizens about the positive contribution that migrants bring to EU host societies.
|
Completion date |
30.06.2022
|
Financing Source |
HORIZON 2020 - MG-7-2-2017 ;
|
Leader |
UNIVERSITY COLLEGE OF LONDON , United kingdom;
|
Partners
|
Administrative Territorial Unit Constanța Municipality together with entities from Germany, France, Holland, United kingdom, Belgium, Czech Republic, Hungary, Romania, Portugal, Sweden; |
Total value of the project
|
5.537.113.75 euro
|
Partner value
Administrative Territorial Unit Constanța Municipality
|
- Total eligible value: 194,375 euro;
- Integral financing from the European Commission;
|
Implementation period |
01.09.2018 - 28.02.2022
|
Objectives
|
Ensuring a comprehensive and objective approach for planning, designing and operating the road territory on the corridors of the international roads network TEN-T;
|
Results |
5 Strategies for a better allocation of the road territory for the roads making the connection with the TEN-T European network.
|
Financing Source |
Regional Operational Programme 2014-2020 - Axis 3/ Investment priority 3.1.B
|
Beneficiary
|
Administrative Territorial Unit Constanţa Municipality |
|
|
Financing contract
|
2897/16.08.2018
|
General objective |
Increase of the energy efficiency for the building where the Ovidius Theoretical High School of Constanța operates, by implementing a set of measures designed to optimize the energy consumption of the building and alignment to the European performance standards and requirements. |
|
|
Total value of the project |
10,350,870.72 lei
|
Value of eligible co-financing (2%) |
205,650.53 lei
|
|
|
Suggested implementation period |
16.08.2018-20.01.2022 |
|
|
Financing Source |
DEAR (Development Education and Awareness Raising)
|
Leader |
Comuni Di Lampedusa E Linosa, Italy
|
|
|
Partener |
Administrative Territorial Unit Constanța Municipality, together with entities from Romania, Italy, Austria, Hungary, Greece, Germany, Slovenia, Bosnia - Herzegovina, Cyprus, Bulgaria, France, Sweden, Spain, Malta
|
|
|
Total value of the project
|
5.352.358,28 euro
|
Value of the partener Administrative Territorial Unit Constanța Municipality |
46.123,01 euro, out of which:
- non-refundable eligible value: 41.335,44 euro;
- eligible co-financing: 4.787,57 euro (10,38%).
|
General objective
|
Improvement of critical understanding of the European, national and local decision-makers, as well as of the public opinion regarding the migration determined by the European border flows.
|
Results |
- Increased number of European citizens informed on global migration and on key factors which determine migration and a high understanding from the local decision-makers regarding the key factors determining the migration flows;
- The "Border cities network" shall be built as an innovative tool in order to develop itself horizontally.
|
Completion date |
20.10.2021 |
|
|
Financing Source |
URBACT III Program - Transfer Networks Phase II
|
Leader
|
City of Chemnitz, Germany |
|
|
Partners
|
Administrative Territorial Unit Constanța Municipality, together with entities from Poland, Latvia, Belgium, Spain, Italy;
|
Total value of the project |
595.000 euro /network (stage I + stage II) |
|
|
Value of the partner Administrative Territorial Unit Constanța Municipality |
44.715 euro, out of which
- ERDF contribution 38.007,75 euro (85%);
- local co-funding 894,30 euro (2%);
|
General objective
|
Revitalisation of vacant and degraded historical buildings, by a proactive approach of connection to the public administrations, owners, investors and users. |
|
|
Results |
Experience and good practices exchange at transnational level. |
|
|
Completition date |
30.09.2021 |
|
|
Financing Source |
Joint Operational Programme "Black Sea Basin" 2014-2020
|
Leader |
Sozopol Municipality, Bulgaria |
|
|
Partners
|
Administrative Territorial Unit Constanța Municipality together with entities from Georgia, Ukraine, Turkey |
|
|
Total value of the project
|
957,792.24 euro
|
Partner value
Administrative Territorial Unit Constanța Municipality
|
- Total eligible value: 118,169 euro;
- Non-refundable eligible amount from ENI: 108,715.48 euro (92 %);
- Eligible co-financing: 9,453.52 euro (8%);
|
General objective
|
Joint development and promotion of cross-border business opportunities in the tourism sector within the Black Sea Basin, with an emphasis on the cultural segment.
|
Results |
A joint strategy for the promotion of cross-border tourism.
|
Completion date |
10.09.2021 |
Financing Source |
Joint Operational Programme "Black Sea Basin" 2014-2020
|
Leader |
Technical Chamber of Greece - Eastern Macedonia Branch; |
|
|
Partners
|
Administrative Territorial Unit Constanța Municipality together with entities from Ukraine, Turkey, Armenia, Greece; |
|
|
Total value of the project
|
827,860 euro;
|
Partner value
Administrative Territorial Unit Constanța Municipality
|
- Total eligible value: 156,562 euro;
- Non-refundable eligible amount from ENI: 144,037.04 euro (92%);
- Eligible co-financing: 12,524.96 euro (8%);
|
Completion date |
10.07.2021
|
Objectives
|
Improvement of the management and persons working in the SMEs in the field of tourism;
|
Results |
Building an integrated platform for the management of SMEs with the support of mentors register, management tools and e-training platform.
|
Financing Source |
POCU 2014-2020 (Operational Programme Human Capital) - Operation 4.1
|
Leader |
Administrative Territorial Unit Constanța Municipality |
|
|
Partener |
"Decebal” Theoretical High School |
|
|
Total value of the project
|
10,854,192.75 lei out of which refundable amount 10,788,092.75 lei
|
General objective
|
Reducing the number of persons at risk of poverty or social exclusion from the studies marginalised community where there is Rroma population, by supporting the social and economic integration of 600 persons from the marginalised community residing in the intervention area which includes the "Henri Coandă" social campus as well.
|
Results |
- Integrated social services, medical and medico-social services
- Supporting access and participation to education;
- Support or access and/or maintaining on the labour market;
- Supporting entrepreneurship and employment on one’s own;
- Improvement of living conditions.
|
Completion date |
15.08.2021 |
Financing Source |
Horizon 2020 - MG.5.5 – 2015;
|
Beneficiary |
City of Anvers, Belgium;
|
|
|
Partener |
Administrative Territorial Unit Constanța Municipality, together with 33 entities from 33 the Consortium: Belgium, Scotland, Italy, Lithuania, China;
|
|
|
Total value of the project
|
17,678,400.00 euro
|
Partner value
Administrative Territorial Unit Constanța Municipality
|
476,078 euro
- Non-refundable eligible value: 476,078 euro;
|
completion date |
30.11.2020
|
General objective
|
Innovative solutions on the manner in which the mobility and accessibility measures are used to increase the functional and social cohesion between the city and the port.
|
Results |
Improvement of the governance for an increased cooperation between cities and ports, creating a more sustainable and healthier city-port environment, creating an integrated transport infrastructure and mobility system, increasing the efficiency of the urban passenger and freight transport.
|
completion date
completion date
completion da
Financing Source |
Free Wi-Fi for Europeans Programme
|
Financing contract |
INEACEF/WiFi4EU/1/2018/010009-013149 |
Leader
|
Administrative Territorial Unit Constanța Municipality |
|
|
Total value of the project |
13.336 euro (voucher) |
|
|
completion date |
18.06.2020
|
|
|
General objective
|
The initiative WiFi4EU promotes free access to Wi-Fi in public areas such as parks, squares and public buildings, libraries, health care centres and museums, in the entire EU. |
|
|
Results |
Installation of new Wi-Fi networks in order to provide free access to Wi-Fi in10 locations on seafront of Constanța Casino. |
Financing Source |
““Project co-financed by the European Social Fund, through the Operational Programme Administrative Capacity 2014-2020”
|
MySMIS code/ project code |
MySMIS 116521/ SIPOCA 405
|
Beneficiary |
Administrative Territorial Unit Constanța Municipality; |
|
|
Total value of the project
|
Total eligible value of the project – 237.579,83 lei;
Eligible co-financing of the beneficiary – 4.751,60 lei;
Non-refundable eligible amount from ESF – 201.942,85 lei;
Non-refundable eligible amount from national budget – 30.885,38 lei.
|
completion date |
23.11.2019
|
Objectives
|
General objective
Elaborating an anticorruption operational procedure, of a guide/manual of good practices of ethics and integrity and training the staff of the Constanţa City Hall in order to enforce the corruption prevention measures.
Specific objectives
Specific objective 1 - Elaborating a guide/ operational procedure on corruption and the necessary measures to prevent it;
Specific objective 2 - Elaborating a campaign for the education of anticorruption behaviour;
Specific objective 3 - Training the employees of the Constanţa City Hall in the field of anticorruption, ethics and integrity (40 persons).
|
Results |
- Guide /manual of good practices, standards of ethics and integrity;
- Elaborated operational procedure;
- Anticorruption education campaigns;
- 40 persons from the Constanța City Hall certified at the end of the courses in the field of corruption prevention, transparency, ethics and integrity.
Procedura în vederea implementarii măsurilor anticorupție
Manual de bune practici, standarde de etică și integritate
Pliant angajați
Pliant cetățeni
|
Financing Source |
“Project co-financed by the European Social Fund, through the Operational Programme Administrative Capacity 2014-2020”
|
MySMIS code/ project code |
MySMIS 109686/SIPOCA 122
|
Beneficiary |
Administrative Territorial Unit Constanța Municipality |
|
|
Total value of the project
|
TTotal eligible value of the project – 422,917.67 lei;
Eligible co-financing of the beneficiary – 8,458.35 lei;
Non-refundable eligible amount from ESF – 359,480.02 lei;
Non-refundable eligible amount from national budget – 54,979.30 lei;
|
completion date |
24.10.2019
|
Objectives
|
General objective – Implementation and certification of the quality management system in accordance with the provisions of the standard SR EN ISO:2015.
Specific objectives
Specific objective 1 – Reviewing and optimisation of the internal work flows;
Specific objective 2 – Implementing the quality management system in accordance with the provisions of the standard SR EN ISO 9001:2015;
Specific objective 3 – Promoting modernisation in the local public administration of Constanța Municipality, by specialising the City Hall employees on topics specific to quality management (551 persons).
|
Results |
- Quality management system ISO 9001 implemented in the City Hall of Constanța Municipality;
- Staff of the local public administration of Constanța municipality trained on topics specific to quality management in public administration.
|
certification |
ISO 9001:2015 |
Financing source
|
European Commission / Government of Netherlands
|
Partners
|
Member states: Netherlands (coordinator), Croatia, Sweden;
Cities: London, Utrecht, Milan, Constanța;
European institutions: European Commission, Eurocities, Urbact, Joint Research Centre
|
Financing contract
|
Volunteer participation
|
Project completion date
|
15.03.2019
|
Objective
|
Identification of issues regarding the air quality and the impact on health, especially in the urban area. The partnership is part of the Urban Agenda of the European Union and implies an exchange of information and good practices between partner states.
|
Results |
Result 1: Establishing the information regarding the air quality and the influence on health – situations specific to each city;
Result 2: Identification of the financing sources and the regulations on air quality in order to establish the contradictions / lacks / specific examples in the legislation;
Result 3: Presenting examples of good practices in the field of air quality;
Result 4: Elaborating a Guide for cities that want to create an action plan regarding air quality. This Guide shall include the best examples of both legislation and implemented actions.(coordinator Constanṭa and Milan). |
Financing source
|
Regional Operational Programme 2007-2013 - Axis 1.1.
|
Beneficiaries |
Administrative Territorial Unit Năvodari
Administrative Territorial Unit Constanţa Municipality
|
Financing contract
|
3535/04.12.2012
|
Total value of the project
|
57,943,411.05 lei
|
Project completion date
|
01.11.2016
|
Objectives
|
Improvement of the access between Constanța Municipality and Năvodari industrial platform by widening and modernising the Mamaia-Năvodari Boulevard, development and valorisation of the economic potential of the area, increase of the accessibility level of the city of Năvodari in order to valorise the touristic potential of the area and increasing its role in the development of Constanța County.
|
Results
|
Rehabilitated and modernised urban streets – 6,3 km. |
Financing source
|
Regional Operational Programme 2007-2013 - Axis 1.1.
|
Beneficiaries |
Administrative Territorial Unit Constanţa Municipality
|
Financing contract
|
3347/17.08.2012
|
Total value of the project
|
4,849,595.99 lei, out of which 3,716,384.73 lei non-refundable amount
|
Project completion date
|
01.11.2016
|
Objectives
|
Rehabilitation works for the retirement home and its extension by a new building P+2E [*ground floor + 2 floors] having the functions of administrative areas, accommodation areas, medical practice areas, socialisation area, storage areas.
|
Results
|
The accommodation capacity has been increased by 48 seats, out of which 28 seats in the new building and 20 seats created as a result of the fact that the offices and medical practices were moved from the old accommodation building in the new building, in the rooms having this destination. |
Financing source
|
Regional Operational Programme 2007-2013 - Axis 1.1.
|
Beneficiaries |
Administrative Territorial Unit Constanţa Municipality
|
Financing contract
|
5052/27.02.2015
|
Total value of the project
|
32,296,166.58 lei, out of which 31,461,099.79 lei non-refundable amount
|
Project completion date
|
31.10.2016
|
Financing source |
Operational Programme for Cross-border Cooperation Romania-Bulgaria 2007-2013;
|
Beneficiary |
Administrative Territorial Unit Constanța Municipality; |
|
|
Partner |
Balchik Municipality, Bulgaria |
|
|
Financing contract |
34544/26.04.2013 |
|
|
Total eligible value of the project
|
1,498,533.24 euro
|
Value from the Administrative Territorial Unit Constanța Municipality |
1,180,618.24 euro, out of which:
- own co-financing: 25,737.48 euro (2,18%)
|
|
|
Completion date |
15.09.2016 |
|
|
Objective |
Diversification of the touristic services by creating a network of bicycle stations in the cities of Constanța and Balchik.
|
Results |
- 24 bicycle stations Constanța Municipality, 6 bicycle stations in Balchik.
- 390 bicycles purchased for Constanța Municipality and 100 bicycles purchased for Balchik Municipality, which shall be provided for the users free of charge.
|
Financing source
|
Regional Operational Programme 2007-2013 - Axis 1.1..
|
Beneficiaries |
Administrative Territorial Unit Constanţa Municipality
|
Financing contract
|
3767/18.07.2013
|
Total value of the project
|
14,281,544.79 lei, out of which 13,995,913.89 lei non-refundable amount
|
Project completion date
|
30.06.2016
|
Objectives
|
Development of the urban public infrastructure in order to modernise the public services in general and the touristic services in special, by building a multilevel parking P+7E+T in Mamaia Resort, Casino-Albatros area.
|
Results
|
394 new parking spaces |
Financing source
|
Sectoral Operational Programme Human Resources Development 2007-2013 - Axis 6 “Promoting social inclusion”
|
Beneficiary |
Administrative Territorial Unit Constanța Municipality
|
Partners
|
“Ovidius” University of Constanța and the Institute for Human Resources Development
|
Financing contract
|
Sectoral Operational Programme Human Resources Development no. 146/6.3/G/130592/29.04.2014
|
Contract value
|
1,990,385 lei
|
Project completion date
|
15.12.2015
|
Objective |
Facilitating access on the labour market for vulnerable groups (women) and building a professional career in the context of promoting an inclusive society for the welfare of women in the urban and rural environment of the South – East region. |
|
|
Results
|
588 women trained/qualified through the following courses: human resources inspector, trade worker, baby-sitter, English language and social and civic skills.
web-site: www.egalitate-de-sanse.ro |
Financing source
|
Regional Operational Programme 2007-2013–Axis 1.1.
|
Beneficiary |
Administrative Territorial Unit Constanța Municipality
|
Financing contract
|
3348/17.08.2012
|
Contract value
|
68,685,880.49 lei, out of which 48,317,628.50 lei non-refundable amount
|
Project completion date
|
17.08.2015
|
Results
|
Modernisation and restoration of the tourist promenade of Constanţa Municipality – Vacation Village area and Mamaia Resort:
Rehabilitation of the main pedestrian alley of the Vacation Village;
Rehabilitation and restoration of Perla plaza;
Rehabilitation and restoration of Malibu – Perla – Mamaia Casino promenade;
Rehabilitation and modernisation of Mamaia Casino promenade and plaza;
Rehabilitation and restoration of Club Castel Casino promenade – up to the vicinity of Vega hotel;
1,090 new parking spaces and 126,102 m2 of restored and furnished promenade (benches, garbage cans, lighting poles etc.).
|
Financing source
|
Regional Operational Programme 2007-2013–Axis 1.1.
|
Beneficiary |
Administrative Territorial Unit Constanța Municipality
|
Financing contract
|
3034/10.05.2012
|
Contract value
|
37,934,638.30 lei out of which 29,807,506.65 lei non-refundable amount
|
Project completion date
|
10.06.2015
|
Results
|
Rehabilitation of the urban infrastructure in the historical centre of Constanţa Municipality by: Rehabilitating a number of 21 streets in the Peninsular area of Constanţa Municipality; Creating/ rehabilitating the rain water sewerage system associated with the rehabilitated streets; Providing urban furniture for the area: lighting poles, road signs, garbage cans, ashtrays.
|
Financing source
|
Regional Operational Programme 2007-2013–Axis 1.1.
|
Beneficiary |
Administrative Territorial Unit Constanța Municipality
|
Financing contract
|
3030/10.05.2012
|
Total value of the project
|
12,370,510.26 lei, out of which 12,123,100.06 lei non-refundable amount
|
Project completion date
|
10.11.2014
|
Results
|
Rehabilitation of the urban public infrastructure in the historical area of Constanţa Municipality by: Repairs and restoration of support walls, guard rail; Arrangement of promenade alley; Modernisation of pedestrian alleys in the park and arrangement of green areas; Urban furniture (kiosks, gazebos, benches, fountains and drinking fountains, lighting poles).
|
Financing source
|
Regional Operational Programme 2007-2013–Axis 1.1.
|
Beneficiary |
Administrative Territorial Unit Constanța Municipality
|
Financing contract
|
3256/23.07.2012
|
Contract value
|
11,067,838.24 lei, out of which 8,392.273.32 lei non-refundable mount
|
Project completion date
|
23.06.2014
|
Results |
Three pedestrian catwalks located in the areas: Vacation Village, Casino and Rex.
|
Financing source
|
Regional Operational Programme 2007-2013 - Axis 1.1.
|
Beneficiaries |
Administrative Territorial Unit Constanţa Municipality
|
Financing contract
|
3031/10.05.2012
|
Total value of the project
|
10,581,294.13 lei, out of which 8,494,477.56 lei non-refundable amount
|
Project completion date
|
10.05.2014
|
Results |
Rehabilitation of the degraded urban public infrastructure of the Historical Centre of Constanța Municipality by rehabilitating the following objectives: Ovidiu Square; Streets: Vasile Canarache, Marcus Aurelius and Aleea Vasile Canarache;
Access stairs:
a) from Marcus Aurelius Street to Tomis Port;
b) Vasile Canarache Steet to Termele Romane Street;
Urban furniture: benches, lighting poles, garbage cans, ashtrays.
Rain water sewerage; Public lighting system; Green areas - embankments.
|
Financing source
|
Regional Operational Programme 2007-2013 - Axis 5.3.
|
Beneficiaries |
Administrative Territorial Unit Constanţa Municipality
|
Partners |
Black Sea / Danube Delta Tourism Promotion Association |
Financing contract
|
1375/05.04.2011
|
Contract value
|
1,036,640 lei
|
Project completion date
|
04.04.2013
|
Objective |
Valorisation of the cultural, historical and natural heritage of the Constanța – Mamaia touristic area, extending the general perception of “vacation in the sun at the seaside” to “knowledge vacation”, on three touristic topics:
Knowledge tourism;
Historical, architectural and religious cultural tourism;
Recreational, nature and biodiversity tourism.
|
Results |
1,640.000 flyers;
4,000 brochures;
Creating the web-site: www.constanta-turistica.ro
|
Financing source |
Regional Operational Program 2007-2013- Axis1.1.
|
Beneficiaries |
Constanta Municipality
|
Financing contract
|
1517/20.04.2011 |
Total value of the project
|
12,186,543.36 lei, out of which 11,942,812.49 lei non-refundable amount
|
Project completion date
|
20.09.2012
|
Results |
265 parking spaces were created
|
Financing source |
Regional Operational Programme 2007-2013 - Axis 3.2.
|
Beneficiary |
Administrative Territorial Unit Constanţa Municipality
|
Partner |
Retirement home in Constanța
|
Financing contract |
611/29.01.2010
|
Total value of the project |
3,189,125.29 lei, out of which 1,725,465.91 lei non-refundable amount
|
Project completion date
|
20.04.2011
|
Results |
Installation replacement (telephone, fire signalling , intercom);
Trim restoration;
Heating installation replacement;
Electrical, sanitary, ventilation installation replacement in the canteen and laundry room;
Equipment with food preparation facilities;
Equipment with laundry room facilities.
|
Financing source |
PODCA 2007-2013 – Axis 1
|
Beneficiary |
Constanta Municipality
|
Partners |
Intercommunity Development Association "Constanta Metropolitan Area" |
Financing contract |
384780/17.03.2009 |
Contract value |
248.746,20 lei, nonrefundable: 228.320,4 lei |
Completion date |
17.03.2010 |
Results |
150 trained civil servants, who operate in the 14 municipalities of the cities that make up the metropolitan area of Constanta, in the fields of project management, public procurement, human resources, social and civic competences and internal audit.
|
Financing source |
Leonardo da Vinci Programe- Networks section
|
Beneficiary |
FREREF – Fondation des Regions Europeennes pour la Recherche en Education et en Formation
|
Partners |
Constanta Municipality; Andaluza Fondo de Formacion y Empleo Foundation – Sevilla (Spain); Generalitat de Catalunya – Departament D’EDUCACIÓ – Barcelona (Spain); Servei d’ocupació de Catalunya. Department de Treball – Barcelona (Spain); Confédération Française des Travailleurs Chrétiens – CFTC Rhône – Alpes – Lyon (France); Chambre des Métiers et de l’Artisanat du Rhône – CMA 69 – Lyon (France); Centre National de la Recherche Scientifique – CNRS – Paris (France); Conseil Régional de Lorraine – Metz ( France); Conseil Régional de Rhône – Alpes – CHARBONNIERES LES BAINS (France); Université de Bretagne Sud – Lorient (France); Agenzia Regionale Istruzione Formazione Lavoro – Regione Lombardia – Milan (Italy); Centro Interateneo per l’Innovazione, la ricerca didattica e la formazione avanzata – Venice (Italy); Ministère de l’Education et de la Formation professionnelle du Grand-duché de Luxembourg/Service de la Formation professionnelle – Luxemburg; Województwo Małopolskie- Cracow (Poland); Conférence Intercantonale de l’Instruction Publique de la Suisse romande et du Tessin –Neuchatel. |
Financing contract |
2007-1985/001-001 |
Contract value |
623.568 euro, nonrefundable |
Completion date |
2010 |
Results |
Papers, essays and case studies on promoting the transfer of best practices across interregional levels and policy implementation "Lifelong Learning", according to the Lisbon Strategy.
|
Financing source |
Regional Operational Programme 2007-2013 - Axis 3.2.
|
Beneficiary
|
Administrative Territorial Unit Constanţa Municipality
|
Partner
|
Retirement home in Constanța
|
Financing contract
|
33/20.02.2009
|
Total value of the project
|
2,885.820.69 lei, out of which 2.823,635.81 lei non-refundable amount
|
Project completion date
|
20 February 2010
|
Results
|
Restoration of bathrooms; restoration of the existing electrical installations;
Rehabilitation of elevators;
Restoration of the existing terrace by replacing the cover;
New building for water pumping system;
|
Financing source |
Program CBC RO-BG 2006 – Priority 4 “People to people”
|
Beneficiary |
Constanta Municipality
|
Partner |
Dobrich Municipality |
Financing contract |
RO2006/018-405.01.04.19 |
Contract value |
43.519 euro, nonrefundable: 35.359 euro |
Completion date |
2009 |
Results |
25 civil servants from Constanta Metropolitan Area and Dobrich District were trained in the fields of project cycle management; rules and procedures on the Structural Funds and the peculiarities of cross-border cooperation;
A portfolio of projects that can be implemented within the Operational Programme CBC Romania - Bulgaria 2007-2013;
A permanent working group composed of civil servants participating at the training.
|
First stage |
Financing source |
URBACT I 2002-2006 Programme
|
Beneficiary |
Grand Lyon (France)
|
Partners |
Constanța Municipality; Goteborg Municipality, Sweden; Birmingham Municipality, Great Britain; Belfast Municipality , Ireland; Arnhem Municipality, Holland; Lodz Municipality, Poland; Pila Municipality, Poland; Wroclaw Municipality, Poland; Nea Ionia Magnesias Municipality, Greece.
REF 1750/FT |
Contract value |
98.100 euro, nonrefundable |
Completion date |
2008 |
Results |
Local Action Plans, case studies, best practice recommendations
|
Second stage |
|
Financing source |
URBACT II 2007-2013 Programme |
Beneficiary |
Grand Lyon (France) |
Partners |
Constanța Municipality; Goteborg Municipality, Sweden; Birmingham Municipality, Great Britain; Belfast Municipality , Ireland; Arnhem Municipality, Holland; Lodz Municipality, Poland; Pila Municipality, Poland; Wroclaw Municipality, Poland; Nea Ionia Magnesias Municipality, Greece.
REF 1750/FT |
Contract value |
594.975 euro, nonrefundable: 542.500 euro |
Timeframe project |
2008-2009 |
Completion date |
2009 |
Results |
Local Action Plans, case studies, best practice recommendations |
Financing source |
PHARE CBC 2005 Programe – People to People
|
Beneficiary |
Constanta County School Inspectorate
|
Partners |
Constanța Municipality; Dobrich Municipality |
Associations |
S.C. Gremlin Computers S.R.L.; EcoRomAmbalaje; MM Recycling; Eco Dobrogea; Eco ZOO Dobrich |
Contract value |
54.870 euro, nonrefundable |
Completion date |
2008 |
Results |
Environmental awareness among students;
Selective collection of packaging waste by the schools from Constanta and Dobrich, ecological summer camp.
|
Financing source |
PHARE CBC 2005 Program – People to People
|
Beneficiary |
Travel agencies in Romania; citizens of the region Dobrich and Constanta County; tourists
|
Partners |
Constanța Municipality; Dobrich Municipality |
Financing contract |
RO2005/017-535.01.03.09 |
Contract value |
53.256 euro, nonrefundable: 47.930,4 euro |
Completion date |
2008 |
Results |
A study on the current situation of the seaside tourism in Romania and Bulgaria;
Setting up an association for the development and promotion of tourism at the Black Sea, in order to strengthen relations of cooperation in tourism between the regions of Dobrich and Constanta (Bulgaria);
It was awarded by the European Commission in the final conference Concertour draft - Accessibility, Strategies, Solutions and Services for improving the European Sustainable Tourism, held in Rome on 25.09.2009.
|
Financing source |
INTERREG III C PROGRAMME
|
Beneficiary |
Brest Urban Community, France
|
Partners |
Constanța Municipality; Technology Park Brest, France; Department of Fire and Emergency Situations, Brest, France; Matosinhos Municipality, Portugal; Institute of Water Northern Region, Matosinhos, Portugal; Taranto Municipality, Italy; Autoritatea Portuară, Taranto, Italia; Ovidius University, Constanța; Local Council Cadiz, Spain; Cadiz Univerity, Spain; Port authority Gijon, Spain; Local Council Isle of Wight, United Kingdom
|
Contract value |
992.000 euro, nonrefundable: 979.500 euro |
Completion date |
2007 |
Results |
Creating a network of exchanges between the port cities facing similar problems.
|
Financing source |
PHARE 2002 - PROGRAMME
”The modernization fund for the development of local government and local budget”
|
Beneficiary |
Constanța Municipality
|
Financing contract |
RO2002/000-586.03.02 |
Contract value |
40.000 euro, nonrefundable: 38.000 euro |
Completion date |
2005 |
Results |
Modernization of document management and operational management by implementing the electronic signature system.
|
Financing source |
Government of Norway
|
Beneficiary |
Economic operators from the city and county of Constanta
|
Partners |
Constanța Municipality; Norwegian Energy Efficiency Group; The Norwegian Society of Chartered Technical and Scientific Professionals; Pollution Prevention Center in Bucharest
|
Contract value |
100.000 euro nonrefundable
|
Completion date |
2005 |
Results |
On-land training; training for Romanian instructors; Manuals on quality management and environmental management
|
Financing source |
General Directorate for Energy and Transport of the European Commission (DGTREN)
|
Beneficiary |
Direct autonomous transport – Constanța Municipality
|
Partners |
Transport and Travel Research Ltd., United Kingdom; Transport Studies Group, University of Westminster, United Kingdom; Hampshire County Council, United Kingdom; Herdfordshire County Council, United Kingdom; Langzaam Verkeer, Belgium; TISPT Consultores Em Transportes Inovacao e Sistemas SA, Portugal; Aristotle University of Thessaloniki, Greece; Asstra-Associatione Transporti, Italy; Citta di Torino, Italy; Romanian Union of Public Transport, Romania; Constanța Municipality, Romania; Interactions Ltd, Irland; Communaute Urbaine de Nantes, France; T.E.Marknadskommunikation A.B., Sweden
|
Contract value |
3000.000 euro, nonrefundable
|
Completion date |
2002 |
Results |
Development and implementation of case studies in areas such as:
1. Intermodal transportation;
2. Repositioning of the public transport;
3. Health and Environment.
|